![HermanMiller Mora System Overhead Storage Скачать руководство пользователя страница 2](http://html.mh-extra.com/html/hermanmiller/mora-system-overhead-storage/mora-system-overhead-storage_installation-and-disassembly-for-recycling-instructions_2126424002.webp)
Step 4
Step 3
3.1 Drill 1/2” hole at each marked location. Make sure there are no utilities
present.
3.2 Insert Wall anchors and secure. Orient toggles vertically.
4.1 Mount cabinet onto wall cleat. Mate cabinet cleat with wall cleat.
Wall Cleat
Cabinet Cleat
Cabinet
1/2” Hole
Wall Anchor
3.3 Place cleat on wall. Insert screws with #10-3/16” flat washer provided
with wall anchor. If screw hole aligns with wall stud, use 3/16”
Toggle
Attachment.
Note: If utilities or other obstructions prevent anchor installation, create
new location in cleat with appropriate drills as close to original location as
possible.
Wall Cleat
Mounting Screws
Wall Stud
3/16” Toggle Attachment
Supplied with Toggle
4.2 Arrange cases in proper location in run.
4.3 Make sure cases mate tight together.
HermanMiller for Healthcare
Assembly Instructions
2
1BJM4F rev D