![HermanMiller Mora System Overhead Storage Скачать руководство пользователя страница 1](http://html.mh-extra.com/html/hermanmiller/mora-system-overhead-storage/mora-system-overhead-storage_installation-and-disassembly-for-recycling-instructions_2126424001.webp)
Parts Included
Tools Required
HermanMiller
Mora
™
System Overhead Storage Installation
and Disassembly for Recycling Instructions
How to assemble your Overhead Storage
(CH300., CH310. Wall Mounted Cases)
Power Driver
Level
Overhead Storage
Glovebox/Paper Towel
Overhead Storage
CH100 Wall Cleat
Sloped Top Overhead
Storage
Step 1
Phillips Bit
Stud Finder
Laser Level &
Tripod
Drill Bit
Tape Measure
Pencil
Safety Glass
1.1 Position Wall Cleat onto wall.
1.2 Measure distance (67.754 for 19” high , 79.765 for 31” high cabinets)
from Floor to center of bottom holes in wall cleat.
1.3 Measure 2” in from where case is to be located to find the vertical
position of wall cleat. Mark Location.
Wall Cleat
Cabinet
Floor
Note: Please refer to Mora System planning guide for different wall
constructions.
2”
67.765 (19”)
79.567 (31”)
CH105. Toggle Bolts
Additional Product Needed - Sold Seperately
CH110. Ganging Hardware
Note: Field supplied #10-3/16” Flat Washer.
Step 2
Mark Holes
2.1 Set up self-leveling laser to match mark, on wall.
2.2 Align Wall Cleat to level line and distance from outside cabinets. Using
Cleat as template, mark mounting holes.
HermanMiller for Healthcare
Assembly Instructions
1
1BJM4F rev D