Pressure
BAR
1.0
5.0
4.0
2.0
3.0
0.
Pressure
BAR
1.0
5.0
4.0
2.0
3.0
0.
Specifications
Maximum Static Pressure:
10.0 bar
Inlet Water Temperature
Min:
0.2 bar
Max:
5.0 bar
Dynamic Water Pressure
5°C
25°C
Cold Water Supply
Min:
5°C
Max:
25°C
65°C Recommended
Tools You’ll Need
Hot Water Supply
Pack Contents
65°C
150mm
Centres
15mm
Compression
Inlet Connections
Inlet Dimensions
IMPORTANT
The inlet hot water must
be at least 10°C above the
required blend temperature.
Increase
Temperature
Decrease
Temperature
Draw around
the concealing
plate as a template,
measuring in by 10mm
to give clearance.
Finish the wall surface.
Using a silicon sealant,
push on the concealing
plate and hold
firmly until set.
*x1
x2
x2
x2
x1
x1
x1
x1
x1
x1
Flat head
Screwdriver
Silicon Sealant
Hexagonal Keys
Pipe Cutter
Drill
Adjustable Spanner
Hot
Cold
Connect the inlet
pipes ensuring the
olives are fitted.
Pipe & Wire Detector
Cavity Dimensions (mm)
* not included with SDACDUAL codes
25
50
Socket Spanner
Install suitable batons
(if required) into the
cavity. Take the finished
wall surface into
consideration when
fitting the valve into the
cavity. Mark the position
of the valve; drill and
plug holes to suit.
Secure the valve using the screws supplied
(solid walls only) or a suitable alternative.
Fit the handles.
Screw the shrouds onto
the valve.
2.5
mm
2.5
mm
Fit the temperature
handle back in the
maximum hot position.
2.5
mm
Pre-set
to 42
°
C
Turn the spindle
to increase or
decrease the
temperature.
Check the temperature
and adjust until
you achieve the
desired result.
Installation
Temperature Adjustment
REMEMBER
To service
your
product!
Plumb
your chosen
outlets into
the valve.
Turn on the
water
supply and
check the
valve for
any leaks.
Turn the
temperature handle
to the maximum
temperature setting.
Remove the handle
and spline adaptor,
then turn on the
shower.
Elbows can be
pointed up
or down
Green Flow
Limiter (Cold)
Valve Configuration
Remove the inlet elbows and filters.
Remove the plastic inserts from the valve
inlets and insert the flow regulators.
Replace the elbows, ensuring the
filters are fitted.
IMPORTANT
If installed in
conjunction with
a combination boiler
flow regulators
must
be fitted.
Yellow Flow
Limiter (Hot)
1
1
1
4
6
5
2
3
3
2
2
REMEMBER
hot on the left,
cold on the right
50mm
75mm
Baton
Cavity Space
Minimum
Fitting Depth:
50mm
Maximum
Fitting Depth:
75mm
Concealing Plate
Adjustment Range:
25mm
Installation Instructions
& User Guide
Prior to Installation
Please leave these instructions with
the end user
All products manufactured and supplied by Heritage are safe to use
provided that they are installed, operated and receive regular maintenance
in accordance with these instructions.
This product needs to be installed in accordance with, and meet the
requirements of the Water Supply (Water Fittings) Regulations 1999 and
current by-laws. For full Installation Requirements & Notes (IRN) please
visit
wras.co.uk/directory.
Isolation valves must be fitted to the inlet water supplies to ensure ease of
future maintenance. Before installing this product the water supply must be
thoroughly flushed in order to remove any swarf, solder etc. Full access must
be made available for future maintenance/servicing purposes.
Before drilling into walls, check that there are no hidden electrical wires,
cables or water supply pipes. This can be checked with the aid of an
electronic detector.
If power tools are used do not forget to:
- Wear eye protection
- Unplug equipment after use
This product must not be modified in any way as this will invalidate
the guarantee.
If in doubt, contact a registered plumber, your Local Water Authority or the
Secretary of the Institute of Plumbing, address as follows:-
The Institute of Plumbing,
64 Station Lane,
Hornchurch,
Essex,
RM12 6NB, Tel: 01708 472791
Product Code: SDABL01 (D1)