Pavilion Marquee Instruction Manual www.herculesgazebo.co.nz [email protected] 0800 810 910
ASSEMBLY INSTRUCTIONS
1. Lay out a drop cloth in the area the tent will be installed to
protect the tent top of dirt and abrasions.
2. Lay out the frame parts on the ground in the approximate
location that they will be when the frame is assembled. (See
frame parts & minimum staking lay out diagram)
3. Start in the middle of one side by connecting both ends of the
spreader insert to each of the spreader bars. Continue this until
all four sides are completed.
4. Start at a corner, insert the spreader bar into the corner fitting.
Continue to insert all spreaders into the corner fittings until a
square is formed.
5. Connect one cross cable to the inside hook on the corner
fitting. Connect the other end of this cable to the hook on the
corner fitting at the diagonal corner. Repeat this method to
secure other cross cables.
Tips: In order to fit the cable onto the 4
th
corner fitting hook, you
may need to lift the frame up on that corner approximately a meter.
This reduces the distance between the corners allowing the cable
to reach the 4
th
corner fitting hook.