background image

The ground will be ready when all the water mix to 

artesian.

Gravel should be laid on the floor to prevent overflowing 

and realize water discharge for holder area.

To test the water drain, place a some water should 

be poured. 15 minutes should be waited to see 

the water mixes with the artesian well. 

MOLELINE SERIES

Installation Guide

R

2

3

4

5

15

min

The concrete should be applied on sides of the hole

 to fix product

.

Отзывы: