The ground will be ready when all the water mix to
artesian.
Gravel should be laid on the floor to prevent overflowing
and realize water discharge for holder area.
To test the water drain, place a some water should
be poured. 15 minutes should be waited to see
the water mixes with the artesian well.
MOLELINE SERIES
Installation Guide
R
2
3
4
5
15
min
The concrete should be applied on sides of the hole
to fix product
.