7)
Lift and hold the 5452B column while one person slips the tubing from the wider
bottom through the top of the column. Set the column in place while draping or
continuing to hold the tubing at the top of the column.
8)
Thread another barbed adapter into the bottom of the 5452A finial.
9)
Set this finial in place, attaching the tubing to the barbed adapter as you set it.
10)
Thread the brass pipe nipple into the top of the finial to produce higher water
action at the top.
11)
Fill with water and start the pump.
PARTS LIST:
1 – pump
1 – cordseal
2 – barbed adapters
1 – 36” section of tubing
1 – 6
½
” brass pipe nipple
1 – plastic snap clamp