background image

Содержание HC 900

Страница 1: ...Henny Penny Heated Holding Cabinet Model HC 900 SERVICE MANUAL...

Страница 2: ......

Страница 3: ...enn FMO1 220 Revised 4 01...

Страница 4: ...as heating of the frypot without shortening 0 TO 3 YEARS During this time any frypot that fails due to manufacturing or workmanship issues will be replaced at no charge for parts labor or freight Hen...

Страница 5: ...n 3 1 3 2 Operating Controls and Components 3 1 3 3 Start Up 3 4 3 4 Operation with Product 3 5 3 5 Vent Adjustments 3 5 3 6 Cleaning Procedures 3 5 3 7 Operating Controls 900 and 903 CDT if applicabl...

Страница 6: ...2000 W 5 12 3000 W 5 13 Z 1612 W 5 14 60 HZ 3086W 5 15 60 HZ 2000 W 5 16 12 w 5 17 2086 W 5 18 TION 6 1 6 2 Genuine Parts 6 1 6 3 How to Find Parts 6 1 6 4 Order 6 1 6 5 6 2 6 6 6 2 6 7 6 2 6 8 6 4 en...

Страница 7: ...eft Hand 05110 Left Hand 05111 Hinged Doors Hinged Doors Product No 05102 Product No 05103 Full Size Unit HC 903 Features Options Features Options Vented Module Product No 05203 Product No 05201 HC 90...

Страница 8: ...d by fol lowing the repair steps contained in this manual 1 5 ASSISTANCE Should you require outside assistance just call your local indepen dent distributor maintained by Henny Penny Corporation In ad...

Страница 9: ...Cont 0682 Theword CAUTIONis used to alert you to a procedure that if not performed properly may damage the unit Theword WARNINGis used to alertyou to a procedure that if not performed properly might c...

Страница 10: ......

Страница 11: ...red with cardboard packing The unit is then packed inside a heavy cardboard carton with sufficient padding to withstand normal shipping treatment Any shipping damages should be noted in the presence o...

Страница 12: ...receptacle with a separate electrical line protected by a fuse or circuit breaker of the proper rating For European markets verify the electrical plug meets the proper electrical rating and country t...

Страница 13: ...5 ENS Stackable 00 05100 and 05110...

Страница 14: ...906 0 05203 Model HC 908 Product No 05201...

Страница 15: ...ns should be followed before operating the cabinet This section contains an explanation of all controls and components and information on operating procedures and daily maintenance __ 2 CONTROL NENTS...

Страница 16: ...d 9 1 8...

Страница 17: ...the cabinet 3 2 7 There aretwoheaters in the of open resistance wire typ sized 120VAC unit is purchased each heater will be rated at 1000 Watts If a full sized 240 VAC unit is purchased each heater wi...

Страница 18: ...e the water pan and put approximately 1 of water in the pan Return the pan to its location esuretopush thewater pan in asfar asitwillgoso that it does not block air from the thermometer and thermostat...

Страница 19: ...adjustments are very easy to follow Thevent setting corresponds tothe number of trays of product With onetray of product set the vent at No 1 With twotraysof product set the vent at No 2 and so on urn...

Страница 20: ...ray hose to clean the unit Failure to follow these instructions could cause component damage 8 Open the doors and remove side racks Clean the racks with soap and water Step 6 9 Clean the interior of t...

Страница 21: ...the PROGRAM button 2 The control beeps and Prog Enter Code shows in display 3 Enter access code 1 2 3 4 Press the INCREASE or DECREASE buttons to change the flashingsetpointtemperature 5 Press and ho...

Страница 22: ...uttons to change the startingtime 7 Press the timer button to set the new starting time and now a different timer button can pressed and it changed 8 Whenfinishedsettingtimers pressandholdthePROGRAM b...

Страница 23: ...4 Enter access code 1 2 3 5 Setup deg F is displayed 6 Press the INCREASE or DECREASE buttons to toggle from F Fahrenheit and C Celsius 7 When correct setting displays press the PROGRAM button to move...

Страница 24: ...tton to return to the Fahrenheit Celsius mode or press and hold the PROGRAM button to exit programming Tech Mode Output Test Heaters CPUCalibration TemperatureCalibration DisplayTests Push buttontest...

Страница 25: ...the PROGRAM button for 4 seconds 2 Setup and Tech isdisplayed 3 Press a timer button under the word Tech Ex Tech Press either 4 or 5 4 5 4 Enter access code 1 1 2 2 1 1 2 2 5 outPtestHtr isdisplayed 6...

Страница 26: ...ot running E 6 Displayed if the temperature probe fails or is unplugged E 41 Displayed if PC board memory scrambles Turn unit OFF then back ON If E 41 reappears replace PC board E 50 Displayed if the...

Страница 27: ...unction proceed as follows 1 Clearly define the problem or symptom when it occurs 2 Locate the problem in the troubleshooting table 3 Review allpossiblecauses then oneat atime work through the list of...

Страница 28: ...ase thermostat setting by moving the knob to a higher number setting eplace gasket per section 5 14 Check heater Replace per sec tion 5 11 Check blower Replace per sec tion 5 13 Hold product only for...

Страница 29: ...y thermostat Faulty blower Faulty blowers Faulty fuse If unit is equipped with Check Blower Replace per section 5 13 Check cabinet temperature with another thermometer If necessary replace thermome te...

Страница 30: ......

Страница 31: ...en the manual refers to the circuit being open the continuity light will not illuminate or the ohm meter will read one 1 or infinite resistance In most procedures of the maintenance section the access...

Страница 32: ...ews located at the corners of the module top emove the screws from the control panel and the back panel that fasten them to the module housing 5 Lift the shell of the module off the unit 6 When work i...

Страница 33: ...ld result in electrical shock 2 Removethe four 4 screwsfrom the control panel and pull it down 3 Remove all wires from the switch Check across the two terminals of the switch for continuity With the s...

Страница 34: ...and thermostat bulbs hileholdingthe blower box remove the two 2 nuts that secure the bulb retaining clamps and remove the thermostat bulb from th e clamps 8 Using a 5 64 Allenwrench loosenthetwo 2 set...

Страница 35: ...rd Failure to do so could result in electrical shock 2 Removethe four 4 screwsfrom the control panel and pull it down 3 Cut the light wires just behind the body of the light emovethelightby squeezingt...

Страница 36: ...the control panel nstall a new thermometer in reverse order 10 Re position the blower box and secure it with the four 4 nuts previously removed e sure that both the thermometer and thermostat capillar...

Страница 37: ...e a 240V 3 000 W unit you must install the new heater sothat the coilsare spread furthest apart where air from the blower enters the heater 8 Reattach the heater wires 9 Refasten the high limit to the...

Страница 38: ...the electrical supply to the cabinet Procedures for blowermotor replacement are the same on both blowers 1 Disconnect the electrical supply to the cabinet Place the power switch in the OFF position an...

Страница 39: ...sure that the motor coil is positioned away from the heater when reinstalling 11 Reconnect thetwo wires to the new blower by stripping the wire ends and fastening with wire nuts 12 Replace the access...

Страница 40: ...4 4 0 Z3 I J 4 489...

Страница 41: ...h 0 OD c n OD 1 I I I _ I...

Страница 42: ...HEATER L I M I T L I M I T BLOWER MOTOR 14 POWER LIGHT MODEL H C 9 0 0 HENNY PENNY CORP EATON OHIO 45320 240V 50 60 HZ 3086...

Страница 43: ...enny Penny d N 0 I I I m R 4 4 u m al 4...

Страница 44: ...7 TEMP PROBE 6 m RELAY I 2 20 CONTROL BOARDP5 4 1 5 6 I I NTL TERMINAL HARMONIZED I N l I PHASE 1 BROWN I LINE I C NUETRAL I LINE 2 BLUE C I MODEL HC 903M 208 240V 50 60 HZ 1612 W HENNY PENNY CORP EAT...

Страница 45: ...HEATER I L L HEATER TEMP PROBE I l l I I 6 c 1 MODEL HC SOOM 240V 50160 HZ 7 15 5 18 3086 W HENNY PENNY GORP EATON OHIO 45320 a...

Страница 46: ...HEATER HEATER TEMP PROBE 20 CONTROL P 4 F 11 I 4 1 6 I I S I 120V 50 60 HZ 1500 2000 WATT I4 14...

Страница 47: ...ONTROL zj P4BOARDP5 2 1 7 1 I N A M E R CONF I G 4 TERMI NAL BLOCK 1 L I N E I 1 C CONTROL f TRANSFORMER TEMP PROBE 15 6 2 6 2 INUETRAL I C GROUND I 3 c I MODEL HC 903M 120V 50160 HZ 1612 W HENNY PENN...

Страница 48: ...OBE RELAY 2 P 20 CONTROL 4 BOARDP 18 I I I I 1 c 1 INTL TERMINAL HARMONIZED I N iFF I 4 BLOCK 1 1 BROWN PHASE I LINE LINE C NUETRAL 2 BLUE Q 15 6 MODEL HC 9OOM 240V 50 60 HZ 2086 W HENNY PENNY CORP EA...

Страница 49: ...I HEATER 1 HEATER F TEMPERATURE PROBE SOL STA REL I D TE AY CONTROL BOARD L E a3 I 2 E C a3 21 2 3 GROUND 120V 50160 HZ 1500 2000 i 6...

Страница 50: ...n I 1 1099...

Страница 51: ...7 INTL I N AMER I TERM I NAL HARMONIZED 1 CONF IG I I L I N E PHASE I BROWN I B 5 NUETRAL I I BLUE I LINE I I I I I r MODELS 23OV 50 60 HZ 1350W 19OOW HENNY PENNY CORP EATON OHIO 45320 44877 HC 9OOM...

Страница 52: ...Henny Penny Model HC 900 5 22 200...

Страница 53: ......

Страница 54: ...as heating of the frypot without shortening 0 TO 3 YEARS During this time any frypot that fails due to manufacturing or workmanship issues will be replaced at no charge for parts labor or freight Hen...

Страница 55: ...as follows 1 Refer to the photographs in the front of the Operation Sec tion and theexplodeddrawingsinthissectionto identify the part needed 2 Use the item number from the exploded drawing to locate t...

Страница 56: ...your parts order Commonlyreplaced items are stocked by your distributor and will be sent out when your order is receive ordered by your distributor from Normally these will be sent to your distributor...

Страница 57: ...4 Hose Intake 1 25963 Hose Exhaust 1 25977 Hose Clamp 4 25919 Slide Vent 1 25942 Coupling Hose 1 25999 Control Panel Stud Assembly 1 38429 Vent ControlArm 1 38367 Knob Vented Module 1 FULL SIZE 900s 2...

Страница 58: ...Indicator Light 2 46 14250 Thermometer 1 47 25863 Knob Thermostat 1 48 SC02 030 Screw 8 B x 3 8 PH THD Black Oxide 4 not shown Item No Part No Description Quantity 49 25717 Label Control Panel 1 4402...

Страница 59: ...enny Penny 2 5...

Страница 60: ...Air Duct Upper KFC Int l CDT 15 Tray 2 52258 Air DuctAssembly Upper KFC Int l 13 Tray 2 25956 Air Duct Assembly HC 903 1 34928 Air Duct Assembly Upper Boston Mkt 2 34550 Air Duct Assembly Upper 906 In...

Страница 61: ...enny Penny I...

Страница 62: ......

Страница 63: ...pply 490 Julianne St Bldg C 1 Jackson MS 39201 601 354 3025 23 Beaullieu Refrigeration Inc 200 North Luke St Lafayette LA 70506 337 235 9755 24 S L E Corporation 1110 Avenue H East Suite 100 Arlington...

Страница 64: ......

Страница 65: ...593 7 843221 Egypt 20 Con Trade Centre 3A Ramsis Street Maaroof Building 83 62 Cairo Egypt Telephone 20 2 770642 762551 Fax 20 2 756258 Estonia 21 Sisustaja As Tihniku 5 11625 Tallinn Estonia Telepho...

Страница 66: ...65 Romania 57 Delta Technologies Romani S A Sector 6 20 Constructorilor Blvd Bloc 20 A sc B 7th Floor Apt 64 Bucharest D599 Romania Telephone 401 220 4261 Fax 401 220 3990 Saudi Arabia 58 Commercial C...

Отзывы: