background image

CSL
CSM
CSB

62

INTRODUCTION

This section provides the installation instructions for the Henny Penny Electric Combi-Steamers.

NOTE:

The installation of this unit must conform to all local, state, and federal codes.  In the absence of codes use

ANSI/NFPA No. 70-latest edition.

NOTE:

Canadian installations must conform with the Canadian electrical code, C22.1, Part 1 and/or local codes.

NOTE:

The installation of this equipment should be performed by a qualified technician.

LOCATION

The proper location of the unit is very important for operation and convenience.  Choose a location which will provide easy
loading and unloading without interfering with the final assembly of food orders.

NOTE:

Adequate clearance must be provided for servicing and for operation.

Table Units:

Minimum clearances have to be maintained from the adjacent walls.

Left Side  

Right Side  

Back Side

CSB,CSM,CSL-6, 10, 1020 

6” (150mm)

2” (50mm)

2” (50mm)

NOTE:

14” (350mm) is recommended at the left side of the unit for service purposes.

Place the combi-steamer on an original Henny Penny stand or on a level and sturdy surface.  Recommended stand height
is 28.5” (725mm).

Minor unevenness of the surface/floor can be compensated by adjusting the legs of the stand or the appliance.

The weight of the units are as follows:

CSB, CSM, CSL-6

297 lbs.

(134.5 kg)

CSB, CSM, CSL-10

349 lbs.

(158.0 kg)

CSB, CSM, CSL-1020

507lbs.

(230.0 kg)

Installation planning should encourage sufficient space to keep the transport trolley/mobile rack at the left-hand side
of the unit.

NOTE:

Ventilation must conform to local, state and national codes. Consult your local fire department or building authorities.

X

Do Not puncture the cabinet with any objects such as drills or screws as electrical shock, or component
damage could result.

X

When moving the unit with a pallet jack ensure it is located under the 1-5/8” x 1-5/8” structure frame before
lifting the unit.

Installation – Electric Units

Содержание B-1020

Страница 1: ...e Back Side CSB CSM CSL 6 10 1020 6 150mm 2 50mm 2 50mm NOTE 14 350mm is recommended at the left side of the unit for service purposes Place the combi steamer on an original Henny Penny stand or on a...

Страница 2: ...shing oven racks into unit The oven rack must be positioned vertically in the unit not tilting For minor unevenness in floor the oven rack can be leveled using the optional leveling device If necessar...

Страница 3: ...70 1990 NOTE All connections must comply with the oven data plate A separate fused disconnect switch or circuit breaker not furnished MUST be installed in the electrical supply line FOR EACH OVEN NOTE...

Страница 4: ...or local plumbing codes The unit has an integrated vented drain system which acts as a reverse flow check valve so it may be connected directly with a P trap to the drain system Installation Electric...

Страница 5: ...ill provide easy loading and unloading without interfering with the final assembly of food orders Installation Gas Units Do Not puncture the cabinet with any objects such as drills or screws as electr...

Страница 6: ...version The stacked version kit comprises two different draft hoods one with a single outlet and the second with a double outlet A flue riser completes the stacked version flue assembly Fix the singl...

Страница 7: ...n integrated vented drain system which acts as a reverse flow check valve so it may be connected directly with a P trap to the drain system Should the water pressure exceed 87 psi a pressure regulator...

Страница 8: ...all electrical connections are to be made in accordance with the CAN CGA B149 1 or 2 installation code and or local code and the Canadian electrical code Part 1 CSA C22 1 Before connecting incoming p...

Страница 9: ...reates double bends causing work fatigue failure of the fittings In all installations where self draining is not necessary connect metal hose in a vertical loop DO NOT CONNECT METAL HOSE HORIZONTALLY...

Страница 10: ...nces in the kitchen are on high flame The mini mum and maximum incoming line flow pressures should be as follows Natural 7 11 water column Propane 11 water column Installation Gas Units continued Neve...

Страница 11: ...be taken by installing a gas pressure gauge on the front of the unit s main gas valves test port This should be done with all gas appliances in operation on the same gas supply line Should the manifol...

Отзывы: