18
1: Installation
2. Thread the nut onto the nut approximately 8 to 10 full turns to
provide adequate mounting thread for the pole mount base.
(See Figure 1-12.)
Figure 1-12. Threading on the lock nut and washer
Routing the cable:
1. When mounting the Crescent V100 using the pole mount, the
cable must first be run through the center of the pole mount
base from top to bottom, through the pole, then through any
bulkheads as needed. (The power/data connector is too large
to fit through the threaded portion of the pole mount base.)
(See Figures 1-13 to 1-15 on page 19 to page 20.)
Note: Be sure to have some slack to move the cable in and
out of the pole mount by a few inches (centimeters). This
will allow you to connect the cable to the Crescent V100
easily.
Содержание Crescent V100 Series
Страница 1: ...Crescent V100 Series User Guide Part No 875 0174 000 Rev A1 ...
Страница 3: ......
Страница 27: ...20 1 Installation Figure 1 15 Running cable through the pole base ...
Страница 50: ...2 CRESCENT V100 OPERATION GPS Overview Understanding the Crescent V100 ...
Страница 67: ......
Страница 68: ...APPENDIX A TROUBLESHOOTING ...
Страница 73: ......
Страница 74: ...APPENDIX B SPECIFICATIONS ...
Страница 79: ......
Страница 80: ...APPENDIX C PARTS LIST ...
Страница 83: ......
Страница 85: ......
Страница 86: ...www hemispheregps com e mail info hemispheregps com ...