background image

 

10-SSI-001_rev.005_ENG

 

 

  

Page 

19

 of 

51

 

maximum bending/deformation for both edges is 13 mm, and 11 mm respectively. No 
buckling/twisting of more than 30 mm across the module diagonal.  

4.  All direct contact of the glass/solar module with metal parts of the substructure must be 

prevented.   

5. 

The  clamps’  width  of  contact  must  have  a  maximum  of  14  mm  and  at  least  12  mm. 
See clamps’ draft with all the dimensions. (Fig.  16) 

6.  The solar module must run at stress-free and force-free conditions.  

7.  Accumulation of water at the solar module must be prevented; might cause corrosion 

on the adhesive bonding or on the PVB foil between front and back glass.  

8.  The  specified  fixation  points  at  the  approved  mounting  assemblies  are  shown  in  Fig.  

14 and Fig.  17. 

                   

 

The approved mounting system is described in Fig.  14. In Fig.  15 the clamps are shown 

as a reference; they should not be taken as standards, because other dimensions are possible, 
except  for  the  dimensions  marked  in  the  figures  (all  in  mm),  these  are  mandatory  to  fulfill 
HelioSphera installation requirements mentioned above. 

1100 mm 

 310 mm 

1300

 mm

 

65

mm

 

Fig.  14 Mounting configuration 

 310 mm 

Содержание HS Atlas Series

Страница 1: ...10 SSI 001_rev 005_ENG Page 1 of 51 SAFETY AND INSTALLATION INSTRUCTIONS...

Страница 2: ...Glass Series 18 5 2 Location and Tilt Angle 23 6 ELECTRICAL INSTALLATION 24 6 1 Grounding 30 6 2 Suitable Inverters 30 6 3 Bypass diode 31 7 MAINTENANCE 32 7 1 Cleaning 32 8 IN CASE OF BREAKAGE RECYCL...

Страница 3: ...10 SSI 001_rev 005_ENG Page 3 of 51 12 4 Connectors 49 12 5 Factory Inspection 50 12 6 Quality Management System 51 Edition October 2011...

Страница 4: ...s such as a higher energy yield in low light conditions a lower vulnerability to deviations of azimuth and tilt angles and an improved temperature coefficient which make them suitable for use both in...

Страница 5: ...ranty HelioSphera assumes no liability for damages incurred due to non compliance with these instructions Please also read the instructions for the other components which make up the total PV system D...

Страница 6: ...uide pertains to modules installed within the European Union only If a module is being installed outside of Europe contact HelioSphera or the product distributor Determine local permits installation a...

Страница 7: ...when handling solar electric modules Be careful when unpacking transporting and storing the modules they are subject to breakage if they are not properly handled and installed Always transport and st...

Страница 8: ...destroy contacts and connectors If not handled and installed according to instructions solar modules can present a lethal hazard Cover module face s completely with opaque material to halt the produc...

Страница 9: ...priate fire resistance Consult your local building department to determine approved roofing materials Do not use modules near equipment or locations where flammable gases can be generated or collected...

Страница 10: ...e the pallet is placed on a horizontal surface Remove the modules one by one from each side of the box ATTENTION Make sure that the modules in the center of the box are the last to be removed Fig 1 Un...

Страница 11: ...apter 5 Front view Rear view Fig 2 HS Atlas with 4 anchors The aluminum anchors which are shown in Fig 3 are fixed to the rear glass of the module using a proven adhesive from the structural glazing i...

Страница 12: ...on for both edges is 13 mm and 11 mm respectively No buckling twisting of more than 30 mm across the module diagonal This requirement is completely fulfilled by HS Atlas modules mounting system 3 All...

Страница 13: ...05_ENG Page 13 of 51 Fig 5 Mounting distance tool Modules after installation should have a 4 cm gap vertically and a 2 cm gap horizontally between each other as shown in Fig 6 Fig 6 Detailed distances...

Страница 14: ...10 16 to a maximum mechanical load of 2400 Pa or 2 4 N m2 This load can be any combination of snow ice or wind In order for the solar modules to withstand this load the module must be supported as sho...

Страница 15: ...mounted on the substructure without using any special tool accelerating the whole installation procedure HelioSphera is aiming to provide different procedures for HS Venus modules to be valid for dif...

Страница 16: ...e taken into account During mounting the following recommendations should be followed 1 It is strongly recommended to install HS Venus modules in vertical portrait position For more info see next poin...

Страница 17: ...EN AW 6063 HelioSphera modules have been designed and tested according to IEC 61646 paragraph 10 16 to a maximum mechanical loading of 2400 Pa 2 4 N m2 or 240 Kg m2 This loading can be any combinatio...

Страница 18: ...be followed 1 It is strongly recommended to install HS modules in vertical portrait position For more info see next point 6 Electrical installation 2 Modules must be set up on the lower edge dimension...

Страница 19: ...ce free conditions 7 Accumulation of water at the solar module must be prevented might cause corrosion on the adhesive bonding or on the PVB foil between front and back glass 8 The specified fixation...

Страница 20: ...t frame of the substructure B Middle support frame of the substructure horizontal C Vertical clamps D Horizontal holding clamps Fig 15 View on the two sided linear fixation set up Both clamps dimensio...

Страница 21: ...1_rev 005_ENG Page 21 of 51 Fig 16 Mounting clamps A possible variation of the mounting system is shown in Fig 17 Fig 18 and Fig 19 80 mm 40 mm 650 mm min 1300 mm 13 1 mm 13 1 mm Fig 17 Mounting confi...

Страница 22: ...frame with rubber F Middle support frame of the substructure vertical with rubber C Vertical clamps D Horizontal holding clamps Fig 18 View on the two sided linear fixation set up Fig 19 Mounting cla...

Страница 23: ...When choosing a site avoid trees buildings or obstructions which could cast shadows on the solar photovoltaic modules especially during the winter months when the arc of the sun is lower over the hor...

Страница 24: ...to the sum of the voltage of each module Never exceed the limit of 1000V on connected modules Voc of modules at low temperatures below 0 C should be taken into account Thus a maximum of 6 modules may...

Страница 25: ...1 Put a fuse of 2A or a diode of 3A in the positive pole of each string you parallel Fig 21 Parallel connection of strings back view Type 1 Maximum protection against reverse currents Use of many pro...

Страница 26: ...001_rev 005_ENG Page 26 of 51 2 Put a fuse of 4A or a diode of 5A in the positive pole of every set of strings Fig 22 Parallel connection of strings back view Type 2 Normal protection and use of fuses...

Страница 27: ...001_rev 005_ENG Page 27 of 51 3 Put a diode of 8A only option in the positive pole of every 3 paralleled strings Fig 23 Parallel connection of strings back view Type 3 Minimum protection and use of d...

Страница 28: ...an be also placed inside DC boxes and not at the end of the strings Fig 24 DC box with 5A diodes in each input HelioSphera can provide you with special diodes fuses integrated in 6mm solar cables and...

Страница 29: ...junction box with cables assembled in the factory for the electrical connection of the modules must never be opened If additional cables are needed use only appropriate cables The solar modules genera...

Страница 30: ...6 2 Suitable Inverters Inverters convert the Direct Current DC of the PV modules into Alternating Current AC The right selection of an inverter in a PV project is very important As described earlier...

Страница 31: ...sidered for system design After few weeks of exposure stabilized nominal power would be reached Most inverters used to have 1 MPPT In this case all the modules must have identical orientation inclinat...

Страница 32: ...te on the surface of the module This build up can reduce the performance of the module Normally the buildup of dust particles will be washed away by periodic rainfall but for some instances module sur...

Страница 33: ...be sure to keep anyone from walking through the area Use cut resistant gloves Pick up all large pieces of broken glass Place them in a suitable plastic or metal container Use a brush to sweep up smal...

Страница 34: ...tack transportation boxes Keep the transportation box dry Keep the transportation box standing flat Do not place sideways upside down or on inclined surface Keep the transportation box away from vibra...

Страница 35: ...ge 35 of 51 9 2 Transportation box specifications Number of Products 20 units Box Box external dimensions Length 1 20cm x Width 0 80cm x Height 1 50cm Box weight 530kg Stack Limitation No stacking Pol...

Страница 36: ...10 SSI 001_rev 005_ENG Page 36 of 51 Warning signs No Hooks This side up Keep dry Fragile No stacking Recyclable product Handle with care Do not step...

Страница 37: ...3 Thickness without junction box mm 6 9 mm 0 4mm Weight kg approx 25 Surface area m2 1 43 Encapsulation Polyvinylbutyral PVB Cell type a Si c Si tandem Front glass mm 3 2 0 2 white glass low iron Bac...

Страница 38: ...10 SSI 001_rev 005_ENG Page 38 of 51 Fig 27 Laser marking 2D barcode Fig 28 Module label...

Страница 39: ...s section 2 5 mm 2 L1 L2 800 1000 mm Rated current 10A Insulation material PA Rated voltage 600V pol pol 1000V pol Degree of protection IP65 Test voltage 4 26kV 50Hz 1min pol pol 6 6kV 50Hz 1min pol F...

Страница 40: ...l has UL classification 94V 0 Repetitive peak reverse voltage 1300 V Surge peak reverse voltage 1300 V 10 2 2 Cables Type FLEX SOL XL 2 5 Nominal cross section 2 5 mm2 Strand design 50 x 0 25 n x mm W...

Страница 41: ...51 10 2 3 Connectors Type MALE PV KST4 2 5 I UR range of cable gland 3 6 A mm Conductor cross section 1 5 2 5 mm2 14 AWG 3 mm Type FEMALE PV KBT4 2 5 I UR range of cable gland 3 6 A mm Conductor cros...

Страница 42: ...le temperature C 40 to 85 Typical operating temperature C approx 20 to 25 above ambient temperature Maximum load N m 2 2400 Maximum over current protection rating MCR 5 Amps The module electrical rati...

Страница 43: ...10 SSI 001_rev 005_ENG Page 43 of 51 12 CERTIFICATES 12 1 Modules...

Страница 44: ...10 SSI 001_rev 005_ENG Page 44 of 51...

Страница 45: ...10 SSI 001_rev 005_ENG Page 45 of 51...

Страница 46: ...10 SSI 001_rev 005_ENG Page 46 of 51...

Страница 47: ...10 SSI 001_rev 005_ENG Page 47 of 51 12 2 Junction boxes...

Страница 48: ...10 SSI 001_rev 005_ENG Page 48 of 51 12 3 Cables...

Страница 49: ...10 SSI 001_rev 005_ENG Page 49 of 51 12 4 Connectors...

Страница 50: ...10 SSI 001_rev 005_ENG Page 50 of 51 12 5 Factory Inspection...

Страница 51: ...10 SSI 001_rev 005_ENG Page 51 of 51 12 6 Quality Management System...