1.0 Important information
To ensure safety and correct operation please read and observe the following instructions carefully before proceeding.
The electrical connection must be fully isolated from the supply up to the final assembly!
Keep the installation
and operating instructions as a reference at the device. After the final assembly the document must be handed out to
the operator (tenant/owner).
1.1 Warning and safety instructions
The adjacent symbol is a safety-relevant prominent warning label. All safety regulations and/or symbols must be
absolutely adhered to, so that any danger situation is avoided.
1.2 Warranty – Exclusion of liability
If the preceding instructions are not observed all warranty claims and accommodation treatment are excluded. This
also applies to any liability claims extended to the manufacturer.
The use of accessories not offered or recommended by Helios is not permitted. Potential damages are not liable for
warranty.
1.3 Certificates - Guidelines
If the product is installed correctly and used to its intended purpose, it conforms to all applicable regulations and CE
guidelines at its date of manufacture.
1.4 Shipping
The unit is packed ex works in such a way that it is protected against normal transport strain. Carry out the shipping
carefully. It is recommended to leave the unit until installation in the original packaging. The fan must be gripped at the
casing or hooked to the integrated crane hooks for transport or assembly. In this respect, use suitable lifting apparatus
and mounting devices. Weight information can be found on the type plate.
Do not transport the fan at connecting cables, terminal box or impeller.
Do not stand under suspended loads!
1.5 Receipt
Please check delivery immediately on receipt for accuracy and damage. If damaged, please notify carrier immediately.
In case of delayed notification, any possible claim may be void.
1.6 Storage
When storing for a prolonged time the following steps are to be taken to avoid damaging influences:
Protection of motor by dry, air- dustproof packing (plastic bags with drying agent and moisture indicators). The storage
place must be water proof, vibration-free and free of temperature variations.
When storing for several years or non-rotation of motor, an inspection of the bearings and an electrical inspection to
VDE 0701 and VDE 0530 are absolutely necessary before starting operation.
When transhipping (especially over longer distances) check if the packing is adequate for method and manner of trans-
portation. Damages due to improper transportation, storage or putting into operation are not liable for warranty.
1.7 Area of application
The GigaBox
GB.. EC
T120
is suitable for transporting contaminated, humid and hot air up to max. 120 °C. The motor
is located outside of the air flow. The units are primarily used in the area of process technology and in commercial kit-
chens. By changing the side panels, a variable discharge direction (free radial on both sides, radial top and radial lateral)
and an optimal adaptation to structural conditions is achieved.
For operation under difficult conditions further inquiry and operation release is necessary as the standard execution
might not be suitable.
Outdoor use is possible with outdoor cover hood and external weather louvers (on one or both sides, accessories). A
drill hole for the rain drainage (accessories) is prepared. The insulation class, the IP rating and the maximum air flow
temperature during normal operation (T
R
) are stated on the fan type plate. The fan is limited for continuous operation S1
and frequent switching operations are not allowed. The fan may only be used for its intended purpose.
Use and operation only according to this installation and operating instructions. Using the fan to move heavily
polluted air or in potential hazardous areas is not allowed! The fan may only be used for its intended purpose!
1.8 Operation as room ventilation device
In order to achieve the desired fan performance, a systematic air supply is essential.
1.9 Performance data
The unit must be installed correctly to achieve the optimum performance. This applies to the installation of the unit, the
ducting and the replacement air supply.
WARNING
m
1
GigaBox GB.. EC T120
Installation and Operating Instructions
CHAPTER 1
GENERAL INSTALLATION
AND OPERATING
INSTRUCTIONS
m
EN
Содержание GigaBox GBD EC 400 T120
Страница 19: ...17 GigaBox GB EC T120 Montage und Betriebsvorschrift DE ...
Страница 37: ...17 GigaBox GB EC T120 Installation and Operating Instructions EN ...
Страница 38: ...18 GigaBox GB EC T120 Installation and Operating Instructions ...
Страница 39: ...19 GigaBox GB EC T120 Installation and Operating Instructions ...