background image

 

 

 
 
 
 
 
 
 
 
 

USER MANUAL

 

 

HELIOS COMBO SPH3600/5000-BL 

(Multiple Mode Inverter) 

 
 
 

 

 

Содержание COMBO SPH3600-BL SERIES

Страница 1: ...i USER MANUAL HELIOS COMBO SPH3600 5000 BL Multiple Mode Inverter...

Страница 2: ...specification in the contract all statements information and recommendations in this document are provided AS IS without warranties guarantees or representations of any kind either express or implied...

Страница 3: ...ply with safety matters during installation operation and maintenance Safety symbol meaning as follows Symbol Description Alerts you to a high risk hazard that could if not avoided result in serious i...

Страница 4: ...COMBO SPH3600 5000 BL Foreword iv Change History Changes between document issues are cumulative The latest document issue contains all the changes made in earlier issues Version 1 0 May 1 2018 First...

Страница 5: ...otection 5 1 1 7 Warning Mark Setting 5 1 1 8 Electrical Connection 5 1 1 9 Measurement Under Operation 6 1 2 Operation Requirements 7 1 3 Operation Environment Requirements 7 2 Overview 8 2 1 Product...

Страница 6: ...on 29 4 7 WiFi GPRS Connection 30 5 Operation Instruction 33 5 1 Opearaion Announcements 33 5 2 Turn on Inverter 33 5 3 Turn off Inverter 33 5 4 Monitoring Setting 33 6 Maintenance and Troubleshooting...

Страница 7: ...tails please refer to safety instructions in the relevant chapters Before attempting to operate device please read safety announcements and operation instructions in this section carefully to avoid ac...

Страница 8: ...re may cause electric shock or fire Before attempting to operate device check that there is no damage or other potential danger in the device visually Check that other external devices or circuit conn...

Страница 9: ...Label Illustartion The labels on the device contain important information about safety operation Don t tear them up or damage them Pay attention to labels on the device The label illustration is as s...

Страница 10: ...by light proof material or the PV array will generate high voltage under sunshine If touching PV array accidently it may cause electric shock or human injury There exists dangerous voltage between th...

Страница 11: ...device damage Observe the following items to ensure that device works normally When the air humidity is more than 95 don t open the door of inverter In the wet or damp weather don t open device perfo...

Страница 12: ...nnection must meet the related country and district standard Don t touch or replace components except terminals 1 1 9 Measurement Under Operation There exists high voltage in the device If touching de...

Страница 13: ...to install operate and maintain device the operator must understand the safety announcements know correct operations and be trained strictly Operator should know the structure and working principle of...

Страница 14: ...rgy storage inverter PV array batteries grid and smart meter optional which allows customers to reduce their dependence on grid and even become energy self sufficient The system can achieve an optimal...

Страница 15: ...0 series inverter is as shown in Figure2 3 Figure2 3 Display panel Table2 1 The illustration of display panel No Mark Meaning Illustration 1 BATT Battery status Green indicator is on which means batte...

Страница 16: ...r off grid generation 4 COM Communication status Green indicator is cycle on 0 5s off 0 5s which means inverter communicates with PC or WiFi GPRS Green indicator is off which means inverter doesn t co...

Страница 17: ...the remaining energy will charge battery If there still has remaining energy it will be supplied for grid connection generation When the energy generated by PV array is insufficient PV array and batt...

Страница 18: ...n PV array generation user can set the charging time and discharging time of battery by WiseEnergy Equipped monitoring software for PC In the peak time set to battery discharging mode for household us...

Страница 19: ...monitoring software for PC In the peak time set to battery discharging mode Except household used the remaining energy will be supplied for grid connection generation in the valley time set to batter...

Страница 20: ...egarded as back up power to supply power for major load as shown in Figure2 8 In the off grid emergency mode the remaining power supply time depends on battery capacity load and battery remaining ener...

Страница 21: ...HELIOS COMBO SPH3600 5000 BL 2 Overview 15 Figure2 8 Off grid emergency mode...

Страница 22: ...of accessories are complete and correct If any discrepancy contact the distributor immediately 3 2 Installation Preparation 3 2 1 Installation Environment Requirements Keep the installation place as d...

Страница 23: ...d adjust installation procedures according to application Step 1 Determine installation place and mark installation holes in the proper height of wall according to the fixed position paper and then dr...

Страница 24: ...by rubber hammer untill all the expansion tubes into holes 3 Pre tighten expansion bolts 4 Loosen flange nut It doesn t need dismantle it Figure3 3 The structure and installation of expansion bolt Ste...

Страница 25: ...HELIOS COMBO SPH3600 5000 BL 3 Installation 19 Figure3 4 Install inverter End...

Страница 26: ...er K1 K2 K3 K4 K6 K5 PE RCD Figure4 1 Electric circuit diagram 1 K1 is PV input switch K2 is battery switch K3 is grid connected switch K4 is major load switch K5 is load switch K6 is total grid switc...

Страница 27: ...nnection symbol No Symbol Illustration 1 BATT Connect with battery 2 WiFi GPRS Install WiFi GPRS module 3 COM Connect with DRM PC METER and BMS to communicate 4 DC SWITCH DC switch optional 5 PV1 PV2...

Страница 28: ...rod of the building where the inverter installed It should separate them The grounding of inverter should connect with the grounding system directly and the impedance should be less than 20m Fasten A...

Страница 29: ...nput of smart meter Connect L N ports in the output of smart meter with total grid switch K6 as shown in Figure4 4 Grid Smart merter L N L N Energy storage inverter L N L N Figure4 4 Smart meter wirin...

Страница 30: ...HELIOS COMBO SPH3600 5000 BL 4 Electrical Connection 24 Figure4 6 Don t connect BACK UP port in parallel Figure4 7 Don t connect BACK UP port with grid End 4 4 PV Input Wiring...

Страница 31: ...oid that inverter can t work or inverter damage Use the equipped PV connector and terminals to perform DC input wiring to avoid poor connection or acring The recommended wire is AWG12 or the cross sec...

Страница 32: ...the negative metal terminal Step 5 Insert the positive wire and negative wire into the corresponding insulation crust respectively If there has a click sound it means it have been inserted properly S...

Страница 33: ...damage Fasten battery cover and nylon cable gland firmly to avoid that water drops into wiring terminals The recommended wire is AWG6 or the cross sectional area of wire is 16mm Step 1 Connect batter...

Страница 34: ...from the inside of nylon cable gland install the battery cover and then tighten the nylon cable gland Figure4 17 Battery wiring When using multiple inverters don t connect battery port in parallel to...

Страница 35: ...ge DRM1 5 PIN2 Orange DRM2 6 PIN3 White green DRM3 7 PIN4 Blue DRM4 8 PIN5 White blue Ref Gen PIN6 Green Com DRM0 PIN7 White brown Reserved PIN8 Brown Reserved Figure4 20 Pin definition of RJ45 plug P...

Страница 36: ...terminals as shown in Figure4 21 The RTS is fixed on either the or pole of the lead acid battery cell located in the center of the battery bank Figure4 21 RTS connection The RTS to be provided with t...

Страница 37: ...nection The WiFi configuration refers to Appendix B WiFi Configuration Router Network PC monitoring Smart phone Server Inverter Figure4 22 WiFi GPRS monitoring plan The monitoring APP can be downloade...

Страница 38: ...HELIOS COMBO SPH3600 5000 BL 4 Electrical Connection 32 China iOS cellphone China Andriod cellphone Foreign iOS cellphone Foreign Andriod cellphone Figure4 23 The QR barcode of monitoring APP...

Страница 39: ...re with grounding wire in the BACKUP port and GRID port Don t touch live wire and neutral wire directly If there has overload protection or short circuit protection power down inverter and then power...

Страница 40: ...0 5000 BL 5 Operation Instruction 34 It also can perform monitoring setting through APP in the phone The details refers to B WiFi Configuration and APP user manual Download APP through scanning QR cod...

Страница 41: ...e system has been tested strictly prior to exiting the factory If any fault happens the system will show the alarm information and in the meantime the system will stop operating Potential reasons or c...

Страница 42: ...ed Yes Inform maintenance personnel if it occurs frequently Battery abnormal None Yes Check whether battery is normal Battery over temperature alarm Included Yes Inform maintenance personnel if it occ...

Страница 43: ...ntenance personnel Inverter over current Included Yes Inform maintenance personnel Leakage current protection Included Yes Inform maintenance personnel Off grid output protection Overload alarm None Y...

Страница 44: ...ed Yes Inform maintenance personnel Relay fault Included Yes Inform maintenance personnel Smart meter connect fault None Yes Check whether smart meter is normal If normal inform maintenance personnel...

Страница 45: ...d battery input with inverter and wait for 5 minutes to discharge completely Please get ready the following information in advance before contacting with us 1 Serial number of inverter 2 Distributor 3...

Страница 46: ...n air when midway transshipment Leaching and mechanical damage by rain snow or liquid objects must be prevented 7 3 Storage During storage place the system strictly according to the directions as show...

Страница 47: ...ax PV input current A 11 Input group N 2 MPPT route N 2 can be paralleled Max MPPT voltage range VDC 125 550 MPPT voltage range with full load VDC 250 450 Start up PV voltage VDC 100 MPPT efficiency 9...

Страница 48: ...00 Rated grid input voltage Vac 220 230 240 Rated grid input frequency Hz 50 60 Rated grid input current A 11 4 10 9 10 4 Max grid input current A 12 5 Grid input short circuit current A 213 Grid outp...

Страница 49: ...tput current A 15 9 Off grid output short circuit current 221 Output waveform Pure sine wave Transfer time ms 10 Transfer efficiency DC AC 94 0 Voltage harmonic 1 Linear load Protection features Resid...

Страница 50: ...re range 25 60 If operating temperature exceeds 45 it is necessary to decrease 3 of rated power per 1 Operating altitude m 0 2000 Communication port RS485 standard Modbus protocol WiFi standard DRM co...

Страница 51: ...e setting hereinafter is operated with Windows XP for reference only If other operating systems or smart phones are used please follow the corresponding procedures 1 Prepare a computer or device with...

Страница 52: ...IOS COMBO SPH3600 5000 BL Error Unknown document property name B WiFi Configuration 46 3 Set WiFi connection to the data logger 1 Open Wireless Network Connection Status and click View Wireless Networ...

Страница 53: ...as default The network name consists of AP and the serial number of the product Then click Connect 3 Connection successful 4 Set parameters of data logger 1 Open a web browser and enter 10 10 100 254...

Страница 54: ...known document property name B WiFi Configuration 48 3 Follow the setup wizard to start quick setting a Click Wizard to start then click Start to continue b Select Wireless connection and select the t...

Страница 55: ...ment property name B WiFi Configuration 49 c Click Refresh to search available wireless networks or add it manually Then select the wireless network you need to connect then click Next d Enter the pas...

Страница 56: ...ally then click Next f Enhance security settings of the WiFi by selecting any options as listed then click Next Option 1 If you choose to hide AP the SSID of the AP network for your WiFi will be invis...

Страница 57: ...to change the encryption mode of the AP network you will need to enter the correspondent encryption method and password before connecting next time Option3 If you wish to change the user name and the...

Страница 58: ...t property name B WiFi Configuration 52 g If setting is successful the following page will display Click OK to restart h If restart is successful the following page will display If this page does not...

Страница 59: ...s interface after the Web server restart and check the network connection status of the data logger After network setting is complete the Wireless STAmode should be enabled and relative information of...

Страница 60: ...s and Abbreviations 54 C Acronyms and Abbreviations A AC Alternating Current AWG American Wire Gauge D DC Direct Current I IEC International Electrotechnical Commission L LED Light emitting Diode M MP...

Страница 61: ...HELIOS COMBO SPH3600 5000 BL Error Unknown document property name C Acronyms and Abbreviations 55 RS485 Recommend Standard485 T THDi Total Distortion of the input current waveform...

Страница 62: ......

Отзывы: