Attach the foil to the frame with the structures
facing downwards
(The structures are on the side which is most
rough).
Use a stapler to attach the foil to the frame.
21
22
Drill a hole on the top side of the frame centered on K1. Tie a rope through it and let the other end
be pulled thrrough the hole on J2. The rope is fastened to a screw on J4a for adjustment of frame
elevation height
Solar Cooker Assembly
J4a
K1
J2
Содержание Solar Cooker
Страница 1: ...Heliac Solar Cooker Assembly Manual v4 3 ...