
17
9 Electrical installation
9.4 FSZ Basis – operation
The FSZ Basis can be operated according to the requirements of DIBt and/or to the requirements of
DIN EN 14637. The DIP switches in the FSZ Basis must be set accordingly.
The DIP switches allow configuring the alarm storage and line surveillance features as well as using
stubs with smoke switches.
123
ON
EN 14637
2 Stiche (2 stubs)
Alarmspeicher (al. storage)
= OFF /
= ON
Fig. 4:
DIP switches for FSZ Basis configuration
EN 14637 – DIP 1
If the FSZ Basis is used according to DIN EN 14637, this DIP switch must be set to “ON”.
If the FSZ Basis is used according to DIBt, the system can be used with and without line surveillance.
OFF
The FSZ Basis is operated without line surveillance. A wire jumper is set across contacts 1
and 5 in the last smoke switch (observe chapter 8, section 1).
ON
The FSZ Basis is operated with line surveillance. The termination module AM 142 (see
Fig. 7) resp. a magnet
1)
(see Fig. 8) must be installed in the last smoke switch of a stub
and at the external manual release button (observe chapter 8, section 2 und 3). Further-
more, the external manual release button (see Fig. 7) must be connected via AM 142 to
the HAT connection terminal in the FSZ Basis.
1)
A magnet can only be used in combination with an ORS 142!
Содержание FSZ Basis
Страница 2: ...2...
Страница 36: ...36...
Страница 37: ...128 128 36 36 8...
Страница 38: ...38...
Страница 39: ...39...