
Installation instructions Art. No.
36222
Page
2 of 2
11.2009
Installation:
All the work has to be done in a voltageless state. Disconnect the mains plug from the voltage supply to
do this.
We recommend that the socket is protected with a differential relay when it is being used outside.
Observe the local regulations. The installation of a differential relay can sometimes be absolutely
necessary in certain areas.
The ground spike socket can only be put into service in an upright position.
Decide on the location where installation has to take place. Make sure that no water can collect at the
location of the ground spike socket.
Push the ground spike into the ground by hand. Please do not use a hammer or similar tool to do this.
The ground spike cannot be rammed into rock. There is danger of injury and the spike could become
damaged.
Make sure that the base is suitable to support the weight of the ground spike socket permanently and
reliably. Level surfaces (such as a lawn surface) are suitable bases.
Make sure before connecting to a consumer device that the maximum load of the ground spike socket
does not exceed 3500W. The plugs must not be connected one after the other.
The ground spike socket must not be moved while they it is connected to the voltage supply.
Make sure that there are no obstacles in the walking area when laying the cable.
Do not bend the cable, make sure that the cable and the plug are free from strain and rotational forces.
Protect the socket and the cables from possible damage.
Connection is made to the power supply by inserting the plug into a socket.
Switch off the power supply if you are away for a longer period of time.
The socket must not be covered.
The name plate must not be removed.
Heitronic
®
H. Vollmer GmbH
Allmendring 29
D-75203 Königsbach-Stein