![HEINE EN200 BP Скачать руководство пользователя страница 44](http://html.mh-extra.com/html/heine/en200-bp/en200-bp_instructions-for-use-manual_2119178044.webp)
MED 113275 2018-02-26
44/212
START SCREEN
Date and time
Rapid single measurements
Double measurements
Manual measurements
Save
Setting
1.3 START-UP
1.3.1 ASSEMBLY AND DISASSEMBLY
The wall plugs supplied with the product are universal wall plugs and suitable
for most building materials (e.g. concrete, solid brick, brick).
1. Hold the drill template horizontally in place on the desired position and mark the
drill holes. Drill a hole of at least 40 mm deep using a Ø 6 mm drill.
2. Fit wall plugs.
3. Use a suitable screwdriver to tighten the two upper screws with a distance of
approx. 3 mm to the wall.
4. There is a USB port on the rear side. Connect the HEINE USB cord and run the
cable via the housing canal to the outside on the left or right hand side. To do so,
press the cable into the clamping hubs, which act as strain relief.
Содержание EN200 BP
Страница 2: ...MED 113275 2018 02 26 2 212 ...
Страница 4: ...MED 113275 2018 02 26 4 212 ...
Страница 37: ...MED 113275 2018 02 26 37 212 ...
Страница 38: ...MED 113275 2018 02 26 38 212 ...
Страница 71: ...MED 113275 2018 02 26 71 212 ...
Страница 72: ...MED 113275 2018 02 26 72 212 ...
Страница 105: ...MED 113275 2018 02 26 105 212 ...
Страница 106: ...MED 113275 2018 02 26 106 212 ...
Страница 139: ...MED 113275 2018 02 26 139 212 ...
Страница 140: ...MED 113275 2018 02 26 140 212 ...
Страница 173: ...MED 113275 2018 02 26 173 212 ...
Страница 174: ...MED 113275 2018 02 26 174 212 ...
Страница 207: ...MED 113275 2018 02 26 207 212 ...
Страница 208: ...MED 113275 2018 02 26 208 212 NOTIZEN NOTES NOTES NOTAS NOTITIAS NOTITIES ...
Страница 209: ...MED 113275 2018 02 26 209 212 ...
Страница 210: ...MED 113275 2018 02 26 210 212 NOTIZEN NOTES NOTES NOTAS NOTITIAS NOTITIES ...
Страница 211: ...MED 113275 2018 02 26 211 212 ...
Страница 212: ...Manufacturer ...