MAVERICKS MANUAL
P.NR. 04
When assembling the Mavericks for the first
time, the frame and the tent are connected
to each other. Once the tent has been put
together, there is no need to repeat the first
assembly. From then on, the frame and the
tent can be unpacked and inflated to how they
were before - the tent “sets itself up”.
FIRST ASSEMBLY
You can now pump up the
IDG until the struts are fully
inflated with air. Everything
else happens by itself.
INFLATE
Spread out the inflatable
frame, and gently fill it with
air until it is erected.
SPREAD OUT IDG
Position the tent under the
erected IDG and connect the
flysheet to the struts.
CONNECT TENT
TO STRUTS
If the struts are twisted
too tightly, simply let out
a little air and correct it.
ARRANGE STRUTS
GROUNDSHEET
READY TO USE
TAKE DOWN
Install groundsheet if
wished.
Once you have completed
the first assembly, the
components can stay joint.
Set-up is easy from now
on: Spread out, pump up,
welcome home!
After first assembly, the
tent can be rolled up and
packed away in one piece. A
description can be found in
the next side.
01
02
03
06
07
04
05