background image

13 

 

 
 
 

3. Assembly Steps 
 

Using appropriate wire stripping tool, strip the wire 

9mm + 1mm 

without damaging the strands. 

 

 

 
 
Insert stripped wire into the terminal wire crimp barrel until it stops. While holding the wire in place, squeeze the crimp tool 
handles together until the ratchet releasses. 
 

 

 
4. Pressed- Asembled 

 

Push contact with cable into the connector housing until you hear the contact give audible click and you fell the contact 
reach the end position. To verify contact engagement, give a slight gentle pull back on the cable, to be sure that the contact 
is locked.  
 

 

 

5. Wiring 

 
Radius (r) min. 5 cable  
  

             

 

 

Содержание NeMo 54 P 195

Страница 1: ...Installation and Operating Instructions www heckert solar com 03 12 2014 Manufactured with sustainable energy Installation and Operating Instructions...

Страница 2: ...alent of the corresponding mains network operator along with the relevant health and safety and accident prevention measures Failure to observe these stipulations may result in grave personal injury o...

Страница 3: ...nverter while under load can result in fatal injury due to arcing NEVER disconnect the solar generator from the power inverter while it is still connected to the network 2 General information regardin...

Страница 4: ...ote and reported immediately in writing Our modules are normally delivered in an upright position on a non returnable pallet so that one person can remove the individual units without risk of back inj...

Страница 5: ...itions You should therefore multiply the module s indicated Isc and Uos values by a factor of 1 25 when determining the voltage ratings of components current ratings of conductors and sizes of fuse fo...

Страница 6: ...snow load and type of roof rafter or purlin type may require the fitting of a set of crossbars Please consult with Heckert Solar before considering any other type of installation The modules must not...

Страница 7: ...any material that may result in the module being exposed to and therefore damaged by sharp or pointed edges or uneven structures The snow load at base sk measured in kN m is calculated using local lev...

Страница 8: ...perly inserted Plug in connectors conform to protection class IP67 and sockets to IP65 Both components are therefore permanently protected from dust Please pay careful attention to the instructions su...

Страница 9: ...ig 7 Max Systemspannung Max system voltage Tension syst me maxi 1000 VDC Typ Type Type Anzahl Numbers Nombre Typ Type Type Anzahl Numbers Nombre Typ Type Type Anzahl Numbers Nombre NeMo 54 P 195 26 Ne...

Страница 10: ...int For integrated roof construction of the HS_P M xxx_4 Solrif R modules on e g slate shingle seam concrete tile etc an additional test for external fire spread according to the standards ENV 1187 4...

Страница 11: ...GmbH Carl von Bach Strasse 11 D ll liability for infringement of patents or other third party rights that might arise from the operation of these modules is likewise excluded unless otherwise specific...

Страница 12: ...12...

Страница 13: ...ng the wire in place squeeze the crimp tool handles together until the ratchet releasses 4 Pressed Asembled Push contact with cable into the connector housing until you hear the contact give audible c...

Отзывы: