
SECTION 6: H
EATER
I
NSTALLATION
17 of 71
Step 6.3 Couplin
g
and Tube Assembly
Step 6.3.1 Couplin
g
and Tube Assembly (Continued)
Tube
Tube
Orient coupling so that
the impact block is in the
2:00 or 10:00 oclock
positions.
Closed
Open
Tab
3" (8 cm) to
4" (10 cm)
Slide Bar/Coupling Lock
Coupling
Wide End
Coupling
Tube
Slide Bar/Coupling Lock
A
Close co
u
pling
w
ith tab.
B
Start Slide bar/Co
u
pling
Lock.
C
Insert t
u
bes into co
u
pling.
D
Tighten co
u
pling to join t
u
bes.
Description
Part Number
Co
u
pling
01329600
Slide bar/Co
u
pling Lock
01329700
T
u
be
91409XXX
Incorrect slide bar
position
Correct slide bar
dimensions
± 2" (5 cm)
Drive slide bar until tight.
End of slide bar should be
within tolerance listed below.
• Repeat Step 6.3 A - D until all tubes are assembled.
See Page 18, Section 6.3.2
.
Ti
g
hten slide bar as shown below.
Содержание VM-115
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 69: ...SECTION12 TROUBLESHOOTING 63 of 71 12 3 Troubleshooting Flow Chart...
Страница 70: ...VM SERIES INSTALLATION OPERATION AND SERVICE MANUAL 64 of 71...
Страница 72: ...VM SERIES INSTALLATION OPERATION AND SERVICE MANUAL 66 of 71 12 5 Pneumatic Connections...
Страница 74: ...VM SERIES INSTALLATION OPERATION AND SERVICE MANUAL 68 of 71...
Страница 77: ...SECTION 14 GENERAL SPECIFICATIONS 71 of 71...
Страница 78: ......
Страница 79: ......
Страница 80: ......