Heatrae Sadia Megalife 100E Скачать руководство пользователя страница 3

3

G3 Requirements (extracts taken from G3 regulations)

(2) 

A hot water system, including any cistern or other vessel that supplies water to or receives expansion water from 

a hot water system, shall be designed, constructed and installed so as to resist the effects temperature and pressure 
that may occur either in normal use or in the event of such malfunctions as may reasonably be anticipated, and must be 
adequately supported.

(3) 

A hot water system that has a hot water storage vessel shall incorporate precautions to:

 

(a) 

prevent the temperature of the water stored in the vessel at any time exceeding 100°C: and

 

(b) 

ensure that any discharge from safety devices is safely conveyed to where it is visible but will not    

 

 

cause a danger to persons in or about the building.

In the Secretary of State’s view Requirement G3(3) will be met for a 

hot water storage system

 that has a vented storage 

vessel if:

a.   

the storage vessel has a suitable vent pipe connecting the top of the vessel to a point open to the atmosphere 

above the level of the water in the cold water storage cistern and over it; and,

b. 

in addition to any thermostat, either the heat source, or the storage vessel is fitted with a device that will

prevent the temperature of the stored water at any time exceeding 100°C; and,

c. 

the hot water system has pipework that incorporates a provision for the discharge of hot water from the safety  

 

devices to an appropriate place open to atmosphere where it will cause no danger to persons in or about

the building.  

Vented hot water storage systems

3.12 

Vented 

hot water storage systems

 should incorporate a vent pipe of an adequate size, but not less than 19mm 

internal diameter, connecting the top of the hot water storage vessel to a point opne to the atmosphere obove and over 
the level of the water in the cold water storage sytem.

3.13 

In addition to the vent pipe referred to in 3.12 and any thermostat provided to control the temperature of the 

stored water to a desired temperature, vented 

hot water storage systems

 should incorporate either:

a. 

for all direct heated sources, a non-self-resetting energy cut-out to disconnect the supply of heat to the storage

vessel in the event of the storage system overheating: and,

 

for all indirect heat sources, an overheat cut-out to disconnect the supply of heat to the storage vessel in the  

 

event of the stored water overheating so that the temperature of the stored water does not exceed 100°C.

3.14

 

Vent pipes should discharge over a cold water storage cistern conforming to BS 417-2:1987. Specification for 

galvanized low carbon steel cisterns, cistern lids, tanks and cylinders. Metric units; or BS 4213:2004 Cisterns for domestic 
use. Cold water storage and combined feed and expansion (thermoplastic) cisterns up to 500 litres. Specification; as 
appropriate.

3.15

 

The cold water storage cistern into which the vent pipe discharges should be supported on a flat, level, rigid 

platform which is capable of safely withstanding the weight of the cistern when filled with water to the rim and fully 
supporting the bottom of the cistern over the whole of its area. The platform should extend a minimum of 150mm in all 
directions beyond the edge of the maximum of the cistern.
Note: When an existing metal cistern is replaced, or a plastic cistern is replaced by one with larger dimensions, the 
existing support should be upgraded, as necessary, with one in accordance the paragraph 3.15.

3.16

 

The cistern should be accessible for maintenance, cleaning and replacement.

Содержание Megalife 100E

Страница 1: ...Megalife Vented Cistern Fed Water Heater Installation manual SOLAR INDIRECT DIRECT...

Страница 2: ...ements of Building Regulation Part L The Megalife vented water heater must be fed from a cold water feed cistern located above the water heater and hot outlets to be served The unit must have a suitab...

Страница 3: ...an 19mm internal diameter connecting the top of the hot water storage vessel to a point opne to the atmosphere obove and over the level of the water in the cold water storage sytem 3 13 In addition to...

Страница 4: ...ns 1999 previously Water Byelaw 30 A vent pipe MUST be connected to the outlet of the heater This must rise continuously and be arranged to discharge into the feed cistern The vent pipe must have a mi...

Страница 5: ...torage cistern The vent pipe must have a minimum bore diameter of 19mm No valves should be fitted to the vent pipe It is not acceptable to replace the vent pipe with a pressure relief device The hot w...

Страница 6: ...6 OUTLET VENT HOT COLD HOT COLD HOT INLET WATER SUPPLY CISTERN TANK COLD MAINS SUPPLY MAX HEAD 40m VENT PIPE Stop Valve OVERFLOW PIPE Fig 02 Typical Vented Installation Schematic...

Страница 7: ...rough the cable gland provided and the outer sheath of the cable firmly secured by tightening the screw on the cable gland Replace the immersion heater cover s before operating DO NOT operate the imme...

Страница 8: ...to 72 C See Fig 04 page 9 If in any doubt contact a competent electrician 5 3 Wiring All electrical wiring should be carried out by a competent electrician and be in accordance with the latest I E E W...

Страница 9: ...t Connections 1 5mm2 3 Core HOFR sheathed cable Indirect control wiring SPINDLE POSITIONS MINIMUM TEMP 10 C MAXIMUM TEMP 72 C APPROX 60 C ROTATE SPINDLE CLOCKWISE FOR TEMPERATURE INCREASE AND COUNTER...

Страница 10: ...rogrammer Boiler Pump Zone valve HTG Cylinder terminal block Room stat Zone valve DHW Junction box 3 2 3 L N Bl GY W G O 1 2 3 HTG ON DHW ON Pump Boiler 3 port mid position valve DHW 2 port Programmer...

Страница 11: ...mperature range of 10 C to 72 C see Fig 04 page 9 6 3 Indirect Units Fill the primary circuit following the boiler manufacturer s commissioning instructions To ensure the primary heating coil in the M...

Страница 12: ...emperature of approx 60o C however it can be set to control between 10o C and 72o C this will usually have been done during installation Adjustments can only be made by opening the terminal cover DO N...

Страница 13: ...the immersion heater Unscrew immersion heater backnut s and remove immersion heater from the unit A key spanner is supplied with the cylinder unit for easy removal tightening of the immersion heater s...

Страница 14: ...rvicing 3 1 4 10 7 5 6 12 4 11 10 2 3 4 5 8 10 12 Fig 08 Spares Item Description Part Number 1 Immersion heater lower 95 606 984 2 Immersion heater upper 95 606 986 3 Immersion heater gasket 95 611 82...

Страница 15: ...radually decreases 1 Outlet flow rate exceeds inlet flow to cold water feed cistern 2 Flow starvation caused by opening further outlets 1 Install higher flow float valve Consider larger cold water cis...

Страница 16: ...eating times assume use of lower element only from cold through 45 C Table 03 Dimensions Type Model Reference Dimensions mm Primary Flow ltrs min 80 C 2 C Coil Rating kW Heat up Time mins Hot Water Ca...

Страница 17: ...s B B C C C Storage volumes V in Litres 100 0 125 0 150 0 170 0 210 0 Standing loss in W 48 0 52 0 60 0 68 0 80 0 Name Megalife Model 100E 120E 150E 170E 210E Volume Litres 100 0 120 0 150 0 170 0 210...

Страница 18: ...lement and thermostat pocket in Duplex stainless steel plate Tin plated Pipe connections All connections accept 22mm outside diameter pipe compression nuts and olives supplied Thread rate is 3 4 BSP m...

Страница 19: ...ctory fitted parts have been removed for unauthorised repair or replacement vi Within 60 days of purchase the user completes and returns the certificate supplied along with proof of purchase to regist...

Страница 20: ...roft Place Pinnacles Harlow Essex CM19 5BT T 0845 055 3811 E sales ewh co uk SPD Units 9 10 Hexagon Business Centre Springfield Road Hayes Middlesex UB4 0TY T 020 8606 3567 Parts Center T 0845 270 980...

Отзывы: