Heatrae Sadia Amptec Скачать руководство пользователя страница 11

11

Connections for 2 or more boilers.

1  CONN 5:  Main power-supply cables. Connect each boiler to its supply live, neutral, and earth, as 

described on p.10. The supplies to each boiler can be on different phases if using a 3-phase  
supply. Safe isolation warning notices must be fitted to units where multiple phase supplies are 
used.

2  CONN 1 pins 2 & 3:  Control signal.  Join all the boiler ‘R’ terminals on the control terminal block  

together and then connect them to the switched live control signal to the programmer control 
circuit. Connect all the boiler ‘N’ terminals on the control terminal block together and then to 
neutral on the programmer control circuit.

3  CONN 1:  Pump connections.  The pump must be connected through a relay assembly to ensure  

that the pump always operates if any one boiler is running.  (section 14, p.27). Relay box 95970135 
is required for a two boiler system and 95970136 is required for a 3 boiler system.

Check the main electrical power connections are tight.  Support the back of the PCB behind the power 
terminals when tightening the main power terminals.  Loose connections can cause a fire and will invalidate 
the warranty.

The control RUN signal is optically isolated from the main boiler supply to enable different phases to be 
used between boilers.  The control signal required to operate the boiler is 220V - 240V at a very low current, 
typically 10mA.

WARNING: THIS APPLIANCE MUST BE EARTHED.

All exposed pipework must be earthed in accordance with IEE Regulations.

After installation, preliminary electrical checks i.e.  short circuit, earth continuity, resistance to earth and 
check for correct polarity etc.  must be carried out.

Before connecting the electrical supply, ensure the system is full of water and set to the correct pressure 
(sealed systems), check for leaks.  It is essential that all the air is purged from the system.  Only then can the 
supply be switched on.

On completion of the work the installation must be tested to IEE Regulations and an NICEIC Inspection and 
Completion Certificate must be issued.

Please take note of the installation information.  If in doubt please contact your local supplier or Heatrae 
Sadia Technical Team on 0344 871 1535, option 1.

FIGURE 7 : BOILER INTERNAL SCHEMATIC

N

E

L

CONN5

      

R        E        N        L

CONN1

CONTROL

ELEMENT

MAIN SUPPLY

CONTROL DEMAND   PUMP OUTPUT

Содержание Amptec

Страница 1: ...1 Amptec Electric Flow Boiler Installation Instructions and User Guide...

Страница 2: ...and commissioning the operation of the boiler should be explained to the user section 9 0 and these instructions left with them for future reference This appliance can be used by children aged from 8...

Страница 3: ...ater is available from a cylinder Can be used in sealed or open vented system installations No flue or fuel tank required Quiet in operation Operates from standard programmers room thermostats etc Pum...

Страница 4: ...V Btu 240V Btu Size 95 022 001 C400 3 5kW 11 900Btu 4kW 13 600Btu 1050 x 90 x 90mm 95 022 101 U401 3 5kW 11 900Btu 4kW 13 600Btu 1050 x 90 x 90mm 95 022 002 C600 5kW 17 000Btu 6kW 20 400Btu 1050 x 90...

Страница 5: ...subjected to extremes of temperature Note Before connecting the pipework ensure the rubber seal at the top of the boiler is firmly in place check it has not become loose in transit The warranty will b...

Страница 6: ...ion pipework on open vented systems to provide a route for air to vent DO NOT FIT THE AAV DIRECTLY ABOVE THE BOILER The Amptec boiler is suitable for operation in sealed or open vented systems It is a...

Страница 7: ...d boiler 22mm branch to third boiler 35mm away to heating circuit Repeat for the return connections Single pump in the 35mm flow line ensure sufficient flow for all 3 boilers i e for 3 x 1200 boilers...

Страница 8: ...ARRANGEMENT USING THE RADIATOR FITTED WITH TWO LOCKSHIELD VALVES NOTES 1 OPEN VENTED SYSTEMS MUST HAVE A MINIMUM HEAD OF 1 5 METRES AND MAXIMUM HEAD OF 30 METRES 2 FIT THE AUTOMATIC AIR VENT AAV AS S...

Страница 9: ...28mm pipework flow and return is required A bypass must be fitted Preference should be made for the equivalent of a 600 x 600 radiator per boiler FIGURE 4 THREE BOILER PLUMBING SCHEMATIC AUTOMATIC AI...

Страница 10: ...ons Access can be gained to the electrical connections by removing the top front panel 1 CONN 5 MAIN POWER Main power supply cables HOFR cable to be used Connect the power cables from the power supply...

Страница 11: ...e main power terminals Loose connections can cause a fire and will invalidate the warranty The control RUN signal is optically isolated from the main boiler supply to enable different phases to be use...

Страница 12: ...L MAINS SUPPLY DOUBLE POLE RCD OR DOUBLE POLE ISOLATION LOCAL TO BOILER DOUBLE POLE ISOLATION SWITCH OR DOUBLE POLE RCD 3A FUSED SPUR OR MCB HEAT RESISTANT CABLE DEMAND SIGNAL FROM CONTROLS PROGRAMMER...

Страница 13: ...BACK OF PCB WHEN TIGHTENING SCREWS ENSURE SCREWS ARE TIGHT SUPPLY CONN 5 CONN 1 FS 1 2A 240V 5 X 20mm REMOVE TOP COVER ONLY TO GAIN ACCESS TO THE CONNECTIONS ON THE PRINTED CIRCUIT BOARD INSIDE THE BO...

Страница 14: ...DIAGRAM ROOM STAT CYLINDER STAT BLUE GRN YLW BROWN GREY ORANGE 2 1 3 C 1 2 E N L N RUN TO BOILER L N CH ON HW ON CH OFF HW OFF FROM 3A FUSED SPUR OR MCB 1 2 3 4 5 6 7 8 9 10 TIME CONTROLLER BLUE GRN Y...

Страница 15: ...2 E N L N RUN TO BOILER L N CH ON HW ON CH OFF HW OFF FROM 3A FUSED SPUR OR MCB TIME CONTROLLER FIGURE 11 TYPICAL Y PLAN WIRING DIAGRAM 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 MID POSITION VALVE E...

Страница 16: ...l zones b A room thermostat or programmable room thermostats in the main zone and TRV s in all other zones 6 Cylinder thermostat and zone valve to control stored hot water Non electric hot water contr...

Страница 17: ...nsure the whole system valves etc are operating correctly Continue to run the pump for some time to purge any air Don t forget to bleed the pump 7 Switch off the main supply RCD and MCB s Ensure it is...

Страница 18: ...IRES FROM CONN1 BLOCK RECONNECT PUMP LIVE TO RUN WIRE RECONNECT PUMP NEUTRAL TO NEUTRAL UNPLUG CONN1 BLOCK FROM PCB ENSURE IT IS SAFE BEFORE CARRYING OUT TEST POWER UP SYSTEM WITH ALL CONTROLS SET TO...

Страница 19: ...TEMPERATURE SWITCH ALARM 2 HEATING DEMAND WATER PRESENT WATER CHECK WATER TEMPERATURE SETPOINT PREVIOUS HEATING DEMAND ON WATER TEMPERATURE 85 C WATER TEMPERATURE 10 C ALARM 1 OVER RUN PUMP 1MINUTE HE...

Страница 20: ...ive cleaners Do not allow water inside the boiler Do not immerse in water 10 0 SERVICING IT IS ESSENTIAL THAT THE BOILER IS CHECKED ANNUALLY Checks must include the electrical connections and inhibito...

Страница 21: ...the power connectors on the elements 6 Disconnect the main power cable to Conn 5 7 Remove the 4 pan head screws washers identified by the black triangles see fig 16 below 8 Carefully remove the PCB as...

Страница 22: ...fit a capacitor between the R run and N neutral terminals on the control connector to prevent the boiler continuing to run when the cylinder and the room thermostats are satisfied This is due to a lea...

Страница 23: ...T FINDING SECTION NO YES IS AN ALARM LED ILLUMINATED GO TO ALARM FAULT FINDING SECTION YES NO IS THE SUPPLY LED ILLUMINATED GO TO SUPPLY LED OFF FAULT FINDING SECTION NO YES THE BOILER IS NOT OPERATIN...

Страница 24: ...ES IS THERE 230V ON FS1 LINK NEUTRAL MAIN TERM CHECK FOR SHORT CIRCUITS ON WIRING TO THE PUMP IF OK REPLACE FS2 FUSE T 2A 240V 20 x 5mm NO YES IS THE MAIN SUPPLY AVAILABLE CHECK 240V IS SUPPLIED TO TH...

Страница 25: ...THERE 230V BETWEEN R AND N CONTROL CHECK THE WIRING TO THE BOILER NO YES IS THE 230V DEMAND AVAILABLE CHECK AND SET THE PROGRAMMER AND THERMOSTATS ON NO YES CALL LED NOT FLASHING NO DOES THE MAIN RCD...

Страница 26: ...ilers to operate the pump Boilers can be connected on a single phase 240V supply or on separate phases of a 415V supply Relay specification Coil 240V 50 Hz Contacts 240V 10Amps N O Normally Open Isola...

Страница 27: ...CONTROL SIGNAL DEMAND 240 volts NEUTRAL CONTROL PUMP SUPPLY FIRST AMPTEC BOILER SECOND AMPTEC BOILER CONTROL PUMP SUPPLY EARTH PLUS CASE EARTH EARTH PLUS CASE EARTH RL2 HEATRAE SADIA PART NUMBER 96 9...

Страница 28: ...on the mains electrical supply After showering the boiler will restart Electric showers are normally run for short periods at a time and therefore shutting down the heating during these times should...

Страница 29: ...n the UK The unit is not guaranteed against damage by frost and the immersion heater is not guaranteed against excessive scale build up This Guarantee in no way affects the statutory rights of the con...

Страница 30: ...t rated heat output and high temperature regime 2 4 99 8 100 2 100 8 100 9 101 5 Useful efficiency at 30 of rated heat output and low temperature regime 1 100 8 101 1 101 7 101 9 102 5 Auxiliary elect...

Страница 31: ...umption Q HE kWh 8661 12986 19472 23796 25958 Product name Model identifier U401 U601 U901 U1101 U1201 Seasonal space heating energy efficiency class Rated heat output Prated kW 4 6 9 11 12 Seasonal s...

Страница 32: ...orporate responsibility and sustainability charters and reduce our printed material we encourage you to download product brochures from our website In designing these files we have taken into account...

Отзывы: