Heatmiser UH8-RF V2 Скачать руководство пользователя страница 8

Wiring Centre

8

 

System Setup

Zone Type Toggle Switches

DIP Switches 

1. 

Demand RF Test

2. 

Enable Creepage

3. 

Heat Enable Delay 1 minute.

4. 

Heat Enable Delay 2 minutes.

In normal use these DIP switches can be ignored and should be

 

Heat Enable Delay, Dip Switches 1 & 2

Switch 2 ON, Switch 1 OFF = Will delay the heat output for 1 minute.

Switch 2 OFF, Switch 1 ON = Will delay the heat output for 2 minutes.

Switch 2 ON, Switch 1 ON = Will delay the heat output for 3 minutes.

 

 

1

ENABLE CREEPAGE  

HEAT ENABLE       1

DELAY (MINS)       2

ON

DIP

2

3

4

AUX

ZONE 1

1    2    3

There is a 3 position toggle switch above each zone. This switch allows

To enable creepage protection, put switch 3 to the ON position

Creepage Protection, Dip Switch 3

Position 1 - Zone output only. 

When a thermostat is in demand, the UH8-RF 

will activate the Zone output to actuators only, 

PUMP

 and 

HEAT 

outputs will remain off.

Position 2 - Zone output with heat demand.

When a thermostat is in demand the UH8-RF 

will activate the zone output to the actuators 

and heat demand to the boiler.

Position 3 - Zone output with heat demand 

and manifold pump.

When a thermostat is in demand, the UH8-RF 

will activate the zone output to the actuators, 

the heat demand to the boiler and the manifold 

pump. 

ZONE 1

1    2    3

ZONE 1

1    2    3

There is a 4 way dip switch responsible for 3 functions;

left in the off position.

3 different switched outputs when the thermostat demands heat.

Содержание UH8-RF V2

Страница 1: ...Model UH8 RF V2...

Страница 2: ...ting the UH8 RF V2 will provide a 230v AC output on the paired zone and also bring on the boiler other heat source output At the same time the UH8 RF V2 can send a radio signal to the RF Switch If the...

Страница 3: ...On the back of the UH8 RF V2 position the clip in the middle and slide down Points A and B locate in the corresponding holes and lock into place Locate the UH8 RF V2 onto the DIN rail from the top Pu...

Страница 4: ...se the common and normally open connections Zones 1 8 Zones outputs are clearly marked L live out to actuator or valve N neutral to actuator or valve There are two connections live L and neutral N bot...

Страница 5: ...on when the zone output is on 2 Light flashes when the zone is in pairing mode Button functions 1 Single press to manually turn output On Off 2 Hold down for 5 seconds to start pairing mode Indicator...

Страница 6: ...pump and heat output ZONE 1 ZONE 2 ZONE 3 1 2 3 1 2 3 1 2 3 MAINS SUPPLY 3 AMP UFH PUMP MANIFOLD LIMIT STAT 1 L L N N ZONE 4 ZONE 4 1 2 3 230 VOLT PUMP N I S N I A M BOILER ENABLE N N ZONE L L N N ZON...

Страница 7: ...ote Boiler enable Boost Repeater Extension Antenna EA1 Extension Antenna included EA1 DEW POINT RT1 SL Dew Point Sensor Flow Sensor L L N N ZONE 8 L L N N ZONE 7 L L NE 6 NO C NC NO C NC 1 2 DEW POINT...

Страница 8: ...itch allows To enable creepage protection put switch 3 to the ON position Creepage Protection Dip Switch 3 Position 1 Zone output only When a thermostat is in demand the UH8 RF will activate the Zone...

Страница 9: ...Model UH8 RF V2 System Configuration PLEASE COMPLETE DURING INSTALLATION UH8 RF V2 Title In Use ZoneType ZoneTitle Under Floor Radiator Zone 1 Zone 2 Zone 3 Zone 4 Zone 5 Zone 6 Zone 7 Zone 8 HotWate...

Страница 10: ...Notes Wiring Centre 10...

Страница 11: ...Wiring Centre 10 Notes Model UH8 RF V2 11...

Страница 12: ...9090 Or view technical specifications directly on our website www heatmiser com Twitter heatmiseruk Facebook facebook com thermostats Slimline RF neoAir RF Switch RF Switch V2 Heatmiser UK Ltd Units 1...

Отзывы: