Heatmaster HM 101 Скачать руководство пользователя страница 4

3

DESCRIPTION

Flue reduction collar

Top cover

Automatic air vent

Central heating flow pipe

Flue pipes and turbulators

Insulation

Burner

Detector NTC3

Heating return

Combustion chamber

Burner chamber plate

Primary circuit

Primary safety valve 

Low water pressure switch

Detector NTC1 and NTC2

Casing front panel

Primary expansion vessel

Domestic cold water inlet

Heating circuit filling

valve with removable hose

and non-return valve

Primary shunt pump

Domestic hot water outlet

Tank-in-Tank heat exchanger

Содержание HM 101

Страница 1: ...66401100 excellence in hot water Installation Operating and Servicing Instructions HeatMaster HM 71 HM 101...

Страница 2: ...incorrect installation or from the use of components or fittings not specified by ACV Failure to observe instructions regarding tests and test procedures can result in personal injury or pollution ris...

Страница 3: ...e most hot water and heating demands can be met Indeed when used in conjunction with HR and Jumbo hot water storage tanks the Heatmaster can supply even the largest hot water requirement Standard equi...

Страница 4: ...ating return Combustion chamber Burner chamber plate Primary circuit Primary safety valve Low water pressure switch Detector NTC1 and NTC2 Casing front panel Primary expansion vessel Domestic cold wat...

Страница 5: ...pane Natural gas propane Maximum Input kW 20 69 9 25 107 22 110 Maximum Output kW 63 0 96 8 Maintenance loss at 60 C of rated value 0 5 0 4 Total capacity L 239 0 330 0 Primary circuit capacity L 108...

Страница 6: ...om 20 to 90 C 2 Hot water mode ON OFF 3 Heating mode ON OFF 4 Heating setting adjustable from 60 to 90 C Parameters accessible in servicing Main default settings Hot water priority active Heating dema...

Страница 7: ...ust be installed by an approved heating engineer in accordance with the prevailing local standards and regulations Flue size should not be less then the outlet size of the boiler Chimney connection ty...

Страница 8: ...many and Luxembourg C53 C13 C33 2 m min 150 min 120 Maximum length concentric 6 metres Maximum length parallel 12 metres Note a 90 degree bend 1 metre equivalent length A condensation drain outlet mus...

Страница 9: ...ies a temperature and pressure relief valve must be fitted consult your ACV stockist for assistance Example of hot water connection with thermostatic mixer 1 Stop cock 2 Non return valve 3 Pressure re...

Страница 10: ...to the primary circuit calculate the expansion capa city necessary for the total volume of the heating system Refer to the technical instructions from a relevant manufacturer of expansion vessels Exam...

Страница 11: ...mounted on the alarm module will now be actived as described below 1 Alarm This contact closes if the MCBA is in lock out 2 External gas valve burner run indication This contact closes if a heat reque...

Страница 12: ...nection 5 Central heating pump 6 HeatMaster shunt pump 7 Room thermostat 8 Low water pressure switch 9 Primary temperature detector NTC 1 10 Primary temperature detector NTC 2 11 Hot water temperature...

Страница 13: ...er tube is coated with metal fibre NIT which in addition to its remarkable heat exchange capabilities gives greater durability The main components are a venturi and one model 71 or two model 101 gas v...

Страница 14: ...w m3 h 2 46 8 60 3 80 13 17 Gas G31 37 50 mbar I 3P Flow m3 h 0 82 2 86 0 94 4 50 Pressure drop combustion chamber mbar 0 6 1 4 Flue gas temperature net C 172 165 Mass flow rate of combustion products...

Страница 15: ...rn OFF the on off switch on the boiler control panel and isolate external electrical supply 2 Turn off the gas supply to the boiler 3 Remove the flue to gain access to the top of the boiler 4 Remove t...

Страница 16: ...our installer will have informed you of this value at the time of installation see Commissioning Section Filling the hot water and heating circuits If the pressure falls below 1 bar the boiler water p...

Страница 17: ...behind a flap on the front of the boiler see picture on page 16 Standby Mode Standby Mode is the normal operation display setting The first digit shows the boiler sequence This sequence relates to cu...

Страница 18: ...ck that sensor NTC2 is propely housed in its pocket if so change sensor NTC2 check that the shunt pump is operating and if so vent the boiler if the fan is turning check the PWM connection if the prob...

Страница 19: ...Efficiency Gas pressure SERVICE RECORD Date serviced CO2 min load CO2 max load Gas LPG Remarks Name and signature Flue gas T Efficiency Gas pressure Date serviced CO2 min load CO2 max load Gas LPG Re...

Страница 20: ...84 E MAIL sales triangletube com ARGENTINA TECNOPRACTICA ALFEREZ BOUCHARD 4857 1605 CARAPACHAY BUENOS AIRES TEL 54 11 47 65 33 35 FAX 54 11 47 65 43 07 E MAIL jchas tecnopractica com BRAZIL SIMETAL IN...

Отзывы: