WS Series Wood Burner

▪ Flue pipe installed crimp/narrow end down

▪ Outer casings installed crimped/narrow end up. (Critical when exposed above the roof)

▪ Inner casings - direction not critical

▪ Flue pipes  - seal all joints including firebox spigot.

- fix with a minimum of 3 stainless steel rivets

▪ Flue pipe spacers - affix to flue pipe

▪ Flue system termination point - Refer to AS/NZS 2918:2001 4.9.1, see Fig. 9.

▪ Flue pipe shall extend not less than 4.6m above top of the floor protector as per

AS/NZS 2918:2001 4.9.1(a)

▪ Façade or chase systems  -  same rule applies as above.

▪ Roof penetration and flashing method refer to NZ Building Code E2.(From 01/07/05)

Note: These instructions apply to 150mm diameter flue pipe systems as tested to

AS/NZS 2918:2001

1.  Either locate the appliance in position or by measuring at the ceiling mark the flue pipe centre position. 

Check that the outer casing is unobstructed through the attic space or roof area.

2.  Spike the centre with a nail. Transfer this position to the next surface above. Plumb bob/laser.

3.  Cut out the ceiling penetration hole – square or rectangle – short axis equals outer casing diameter 

plus 50mm, long axis as required. See Table 5 . Perform the same at the roof penetration.

4.  Frame out the hole with minimum  75 x 50 timber or as required  for roofing material. Minimum 

requirement at roof penetration see NZ Building Code E2 Acceptable Solution (from 01/07/05).

5.  Install the outer casing so that :-

  (i) lower end is flush with the underside of the ceiling material and

  (ii) with the addition of metal “L” brackets, affix to the outer casing at 90 degrees secure the outer 

casing centrally to the ceiling and roof nogs.  Alternatively substitute the “L” brackets for 25mm thick 

non heat sensitive packers. Secure the outer casing through the packers with horizontal fixings to 

the nogs. Refer to the General Instruction for termination height. The option of outer casing slips to 

be taken into account.

6.  Flash the outer casing to the roof material with the appropriate approved flashing.

7.  If using an outer/inner casing combination, now install the inner casing ensuring it extends a minimum 

200mm above the high side of the roof penetration. If not using a combination see ‘11’ below.

8.  Refer to Firebox Installation, points 1 & 2.

9.  Prepare the ceiling plate and place upside down over the flue spigot.

10. Install the flue pipes by preferred method – either up or down the outer casing. Affix each length 

per the notes in General Instructions (above). Extend the flue pipe  above the outer casing to suit 

the casing cover/cowl assembly.

11. If the inner casing has not been installed, install now. Refer to 7 above  for minimum height.

12. Install the cowl assembly, i.e. Top spacer, casing cover and cowl.

13. Position and secure the ceiling plate with the screws and spacers.

14. Wipe the flue pipe to remove finger marks.

15. Refer to Firebox Installation, point 3.

16. If flue offset is required, refer to AS/NZS 2918:2001 4.1

GENERAL INSTRUCTIONS FOR FLUE SYSTEM

Содержание ECO CHOICE WINS18

Страница 1: ...to installations with tested flue systems as per AS NZS 2918 2001 Appendix F with a ceiling angle between 0 30 inclusive For installations with a ceiling angle greater than 30 refer to Fig 7 8 and AS NZS 2918 2001 4 6 3 b Ceiling Plate may vary in size depending on ceiling angle Please specify ceiling pitch prior to ordering the ceiling plate Heatilator Eco Choice series wood burner s are tested a...

Страница 2: ...ily many years of enjoyment in the warmth and comfort of your hearth appliance Thank you for choosing Heatilator and Welcome to the Quadra Fire Family OVERALLAVERAGEEFFICIENCYBURNINGHARDWOOD WHENTESTEDINACCORDANCETOAS NZS4012 1999 77 AVERAGEPARTICULATEEMISSIONFACTORBURNINGHARDWOOD WHENTESTEDINACCORDANCE TOAS NZS4013 1999 1 0g kg MAXIMUMAVERAGEHEATOUTPUTBURNINGHARDWOOD 7 7kw APPROVEDFUEL BURNONLYHA...

Страница 3: ...iew Figure 3 3 Side View Figure 3 2 Top View 24 1 4 in 616mm 15 11 16 in 398mm 9 7 16 in 240mm 33 1 4 in 845mm 10 1 2 in 267mm 10 1 2 in 267mm 5 3 16 in 132mm 21 1 16 in 534mm 6 1 16 in 154mm 4 1 2 in 114mm 7 5 16 in 186mm 20 in 508mm A B Surround Sizes A B SP WINS18 STD 1092mm 787mm SP WINS18 LRG 1295mm 864mm ...

Страница 4: ...Protector can include ceramic tiles with grouted joints fixed directly onto a wooden floor or a sheet of toughened glass panel steel or any other non combustible material laid directly onto a wooden floor If installed directly onto a concrete slab the concrete slab can be considered as the floor protector but must maintain the minimum measurement listed NOTE HEAT SHIELD REQUIREMENTS FOR HEAT SENSI...

Страница 5: ...April 7 2014 7065 144A Page 5 WS Series Wood Burner Fig 4 MINIMUM CLEARANCES CONT 800mm Mantle uprights must be less than 50mm thick ...

Страница 6: ...s must be removable and replaceable for cleaning and re installation NOTE Refer to chimney liner manufacturer for recom mendations on supporting the liner Installation into fireplaces without a permit will void the listing A Venting Systems Chimney Connector It is also known as flue pipe or stove pipe It must be 152 mm minimum diameter stainless steel connector pipe Chimney The chimney can be new ...

Страница 7: ...iciency and decrease creosote deposits in the chimney When a connected flue or liner is in use the insert is able to breathe better by allowing a greater draft to be created This great draft can decrease problems such as difficult start ups smoking out the door and dirty glass G Installation Into A Factory Built Fireplace 1 When installed in a factory built fireplace a full stainless steel rigid i...

Страница 8: ...eel Liner or Other Approved Lining System Minimum 8 in 203mm Masonry Thickness in Front of Smoke Chamber Damper Plate Removed or Fastened in Open Position Seal with Non Combustible Material Minimum Clearance in Accordance with Insert Listing Floor Protection in Accordance with Insert Listing Follow Manufacturer s Instructions for Maximum Liner Extension Above Chimney Maximum 30 Degrees Offset in C...

Страница 9: ...able Solution from 01 07 05 5 Install the outer casing so that i lower end is flush with the underside of the ceiling material and ii with the addition of metal L brackets affix to the outer casing at 90 degrees secure the outer casing centrally to the ceiling and roof nogs Alternatively substitute the L brackets for 25mm thick non heat sensitive packers Secure the outer casing through the packers...

Страница 10: ...DOUS CONDITIONS WHERE SUCH ACTION IS CONSIDERED THE MAN UFACTURER SHOULD BE CONSULTED IN THE FIRST INSTANCE CAUTIONS CRACKED AND BROKEN COMPONENTS e g GLASS PANELS OR CERAMIC TILES MAY RENDER THE INSTALLATION UNSAFE WARNING ANY MODIFICATION OF THE APPLIANCE THAT HAS NOT BEEN APPROVED IN WRITING BY THE TESTING AUTHORITY IS CONSIDERED AS BREACHING AS NZS 4013 WARNING DO NOT USE FLAMMABLE LIQUIDS OR ...

Страница 11: ...coverage under this manufacturer s warranty begins on the date of first occupancy of the dwelling or six months after the sale of the product by an independent authorized HHT dealer distributor whichever occurs earlier The warranty period for this manufacturer s warranty shall commence no later than 24 months following the date of product shipment from HHT regardless of the installation or occupan...

Страница 12: ... supplied with the appliance or any other components not expressly authorized and approved by HHT 8 modification of the appliance not expressly authorized and approved by HHT in writing and or 9 interruptions or fluctuations of electrical power supply to the appliance Non HHT venting components hearth components or other accessories used in conjunction with the appliance Any part of a pre existing...

Страница 13: ...April 7 2014 7065 144A Page 13 WS Series Wood Burner SERVICE MAINTENANCE LOG Date of Service Performed By Description of Service ...

Страница 14: ...Page 14 7065 144A April 7 2014 WS Series Wood Burner Date of Service Performed By Description of Service SERVICE MAINTENANCE LOG ...

Страница 15: ...April 7 2014 7065 144A Page 15 WS Series Wood Burner Date of Service Performed By Description of Service SERVICE MAINTENANCE LOG ...

Страница 16: ...r phone Notes DO NOT DISCARD THIS MANUAL CAUTION Important operating and maintenance instruc tions included Leave this manual with party responsible for use and operation Read understand and follow these instruc tions for safe installa tion and operation DO NOT DISCARD Please contact your Heatilator dealer with any questions or concerns For the number of your nearest Heatilator dealer log onto www...

Отзывы: