![Heatiator CL36D Скачать руководство пользователя страница 30](http://html.mh-extra.com/html/heatiator/cl36d/cl36d_owners-manual_2116921030.webp)
30
Figure 8.9 Ceiling/Attic Construction
H. Complete Installation
WARNING! Risk of Fire!
You MUST maintain 2 in.
(51 mm) air space to insulation and other combustible
materials around the chimney system. Failure to do so
could cause overheating and fire.
• Keep chimney sections from separating or twisting.
• You may secure straight chimney sections at the joints
with screws no longer than 1/2 in. (13 mm).
The following steps should be skipped if using a
chase.
• Install roof flashing appropriate to roof pitch.
• Install round termination cap and storm collar.
I. Install Flashing
• Assemble chimney so it passes through the framed
opening.
• Slip the flashing over the chimney.
• NOTICE:
Roofing shingles must be below the flashing
plate on the lower side of a sloped roof and over the
flashing plate on the sides and top.
• Nail the flashing to the roof. Keep gaps between the
flashing plate and the roof to a minimum.
• Caulk the flashing plate and roof junction as well as
the vertical seam on the flashing. All nail heads must
be caulked with a roofing sealant.
• Caulk the overlap seam of any exposed pipe sections
that are located above the roof line to prevent leaks.
Heatilator • CL36D, CR36D • 12538 • Rev Z 7/12
G. Cut out Hole in Roof
• Refer to Figure 8.9.
• Plumb from roof to center of chimney.
• Drive a nail up through roof to mark center of pipe.
• Measure to either side of nail and mark the 14-1/2 in. x
14-1/2 in. (368 mm x 368 mm) opening required.
• Measure opening on the horizontal; actual length may
be larger depending on roof pitch.
• Cut out and frame opening.
• Refer to
Chapter 25
of the
Uniform Building Code
for
roof framing details.