
EXHAUST HORIZONTALLY THROUGH A WALL
Position the stove, adhering to clearances.
•
Locate position of hole in wall, directly behind stove’s exhaust vent.
•
Cut an opening in the wall: 9 5/8” round for 3” vent or 10 5/8” for 4”
vent. This provides space for the wall thimble.
•
After exiting exhaust pipe through the wall, you should install 3’
vertical rise to evacuate exhaust gases in case of power outage.
Attach end cap and seal outside wall thimble with non-hardening
water proof mastic.
EXHAUST VERTICALLY THROUGH A CEILING
•
Locate exhaust pipe location at the rear of the stove. Drop a plumb-
bob to the center of the exhaust pipe at the rear of the stove with
clean-out “T” installed. Mark center point on the ceiling. Cut a square
hole in ceiling, to accommodate fire-stop support assembly: 9 5/8”
square hole for 3” or 10 5/8” square hole for 4”.
Connect chimney section from stove upwards.
When the pipe passes through the fire-stop at the ceiling, tighten bolts
and clamp around pipe.
•
Always maintain 3” clearances from combustible materials, when
passing though additional floors or ceilings. Always install fire-stop
spacers.
•
After lining up the hole in the roof, always 3” larger than the pipe all
the way around, install upper edge and sides of flashing under roof
materials. Nail to roof on top edge under roof material. DO NOT NAIL
ON LOWER EDGE.
Seal nail heads with sealant or mastic.
Apply a non-hardening, waterproof mastic where the storm collar will
meet the vent pipe. Slide storm collar down until it sits on flashing. Put
on a cap and twist to lock.
Page 6
Содержание HTP BAY
Страница 22: ...DIAGRAMS Page 21...
Страница 23: ...Page 22...