background image

14

Figure  9.

Venting with (1) 45

0

Elbow and (1) 90

0

 Elbow.

V (MIN.)

H  (MAX.)

1 FT (305mm)

3.5 FT (1.0m)

2 FT (610mm)

4 FT (1.22m)

3 FT (914mm)

6 FT (1.86m)

4 FT (1.22m)

8 FT (2.48m)

5 FT (1.52m)

16 FT (4.8m)

VENTING WITH (1) 45

o

 ELBOW

and

(1) 90

o

 ELBOW

H MAX. = 16 FT (4.8m)

 V +  H MAX. = 40 FT (12.2m)

Use SL D-Series
components only.

H + H

1

 (MAX.)

2.5 FT (762mm)

VENTING WITH (1) 45

O

and (1) 90

O

 ELBOW

NOTE: For horizontal vent-
ing with enclosed elbow at
unit an Elbow Heat Shield is
required. See Figure 8.

NOTE: There MUST be a 25% reduction in
total H when using flex vent.

H

V

H

1

H

Содержание HV-CDN

Страница 1: ...IANCE FOR FUTURE REFERENCE 1 This appliance may be installed in an af termarket permanentlylocated manufac tured mobile home wherenotprohibited by local codes 2 This appliance is only for use with the...

Страница 2: ...DERSTAND all instructions carefully before starting the installation FAILURE TO FOLLOW these installation instructions may result in a possible fire hazard and will void the warranty Prior to the firs...

Страница 3: ...A Vent System Approvals 12 B Installing Vent Components 17 C Vent Termination 20 Step 4 Positioning Leveling and Securing the Fireplace 23 Step 5 The Gas Control Systems 23 Step 6 The Gas Supply Line...

Страница 4: ...h local codes or in the absence of local codes with the National Electric Code ANSI NFPA No 70 in the United States or to the CSA C22 1 Canadian Electric Code in Canada These models may be installed i...

Страница 5: ...d benefit Failure to follow these instructions will void the owner s warranty and may present a fire hazard The Heat N Glo Warranty will be voided by and Heat N Glo disclaims any responsibility for th...

Страница 6: ...ARS RATING PLATES LABELS GAS CONTROLS BOTTOM GRILL 31 787mm 29 1 2 751mm 15 1 8 385mm 5 1 8 129mm 20 509mm 3 3 8 87mm 6 3 4 171mm 12 305mm ELECTRICAL ACCESS 6 5 8 168mm 11 278mm 25 636mm 12 1 2 317mm...

Страница 7: ...ike structure built to enclose the gas fireplace and or its vent system Vertical vents that run on the outside of a building may be but are not required to be installed inside a chase CAUTION TREATMEN...

Страница 8: ...ow edge and to the front of the frame Note The center of the vent framing hole is 1 inch 25mm above the center of the horizontal vent pipe VENT FRAMING HOLE D Step 2 Framing the Fireplace Fireplace fr...

Страница 9: ...4 inch inner pipe 6 5 8 inch outer pipe 120 3048mm 24 610mm 36 914mm 60 1524mm 9 1 4 6 5 8 6 1 2 6 3 8 6 1 2 9 5 8 9 5 8 6 5 8 6 3 8 8 3 4 SL 09D 12 17 SL 12 17D SL12 17D SL 24D SL 36D SL 48D 47 3 4 3...

Страница 10: ...vent termination kit and should be used in conjunction with this Installers Guide The flame and ember appearance may vary based on the type of fuel burned and the venting configuration used Identifyi...

Страница 11: ...For horizontal venting with enclosed elbow at unit an Elbow Heat Shield is required See Figure 8 NOTE There MUST be a 25 reduction in total H when using flex vent HORIZONTALVENTING WITH ONE 45o ELBOW...

Страница 12: ...52m 16 FT 4 8m VENTING WITH 1 45o ELBOW and 1 90o ELBOW H MAX 16 FT 4 8m V H MAX 40 FT 12 2m Use SL D Series components only H H1 MAX 2 5 FT 762mm VENTING WITH 1 45O and 1 90O ELBOW NOTE For horizont...

Страница 13: ...H H1 MAX 40 FT 12 2m V V1 MIN H MAX H H1 MAX 3FT 914mm 3FT 914mm 6FT 1 8m 4 FT 1 22m 4 FT 1 22m 8FT 2 4m 5 FT 1 52m 5 FT 1 52m 10 FT 3 0m 6FT 1 8m 8FT 2 4m 16 FT 4 8m NOTE For horizontal venting with...

Страница 14: ...T 1 8m 3 FT 914mm 8FT 2 4m 4 FT 1 22m 10FT 3 0m 5 FT 1 52m 16 FT 4 8m VENTING WITH 1 45O ELBOW and 2 90o ELBOWS H H1 MAX 16 FT 4 8m V H H1 MAX 40 FT 12 2m NOTE For horizontal venting with enclosed elb...

Страница 15: ...IAGRAM STARTING COLLAR STOVE SEALANT BEAD 1 INCH 25 4mm FIRST VENT COMPONENT WARNING ENSURE THAT THE FIBER GLASS ROPE GASKET SUPPLIED WITH THE FIREPLACE SEALS BETWEEN THE FIRST VENT COMPONENT AND THE...

Страница 16: ...either interior or exterior walls Cut a 10 inch by 10 inch 254mm X 254mm hole for SL D series pipe NOTE The center of the hole is one 1 inch 25 4mm above the center of the horizontal vent pipe Positi...

Страница 17: ...iling using the centerpoint previously marked Frame the hole with framing lumber the same size as the ceiling joists Figure 18 Ceiling Firestop Ceiling Side If the area above the ceiling is NOT an att...

Страница 18: ...of the wall firestop to secure the vent pipe in place For trapezoidal cap termination kits Using screws secure the cap to the exterior wall through the flanges in the cap Figure 20 Round Trapezoid Te...

Страница 19: ...ay be opened C 9 U S A 12 Canada clearance to permanently closed window D 18 vertical clearance to ventilated soffit located above the termi nal within a horizontal distance of 2 feet 60 cm from the c...

Страница 20: ...MUM HEIGHTS PROVIDED THE TERMI NATION CAP IS AT LEAST TWO 2 FEET FROM A VERTICAL WALLAND 2 FEET BELOW AHORIZON TAL OVERHANG NOTE This also pertains to vertical vent systems in stalled on the outside o...

Страница 21: ...g Leveling and Securing of a Fireplace Figure 24 Gas Control System STANDING PILOT Step 5 The Gas Control System WARNING THIS UNIT IS NOT FOR USE WITH SOLID FUEL The type of gas control system used wi...

Страница 22: ...the outer casing of the fireplace Open the fireplace lower grille insert the gas supply line through the gas line hole and connect it to the 3 8 inch 10mm inlet of the gas valve When attaching the pip...

Страница 23: ...ory junction box before the fire place is permanently installed Wall Switch Position the wall switch in the desired position on a wall Run a maximum of 25 feet 7 8 m or less length of 18 A W G minimum...

Страница 24: ...eplace CAUTION IF JOINTS BETWEEN THE FINISHED WALLS AND THE FIREPLACE SURROUND TOP AND SIDES ARE SEALED A 300 F MINIMUM SEALANT MATE RIAL MUST BE USED THESE JOINTS ARE NOT RE QUIRED TO BE SEALED ONLY...

Страница 25: ...ining vermiculite and ember materials for use during fireplace servicing Note Ensure vermiculite remains in the base pan only Vermiculite must not con tact any burner surfaces 7 Reinstall and latch th...

Страница 26: ...l of the heater matching the slot in the bottom of the log to the metal tab on the bottom pan Insert the 2 pins into the top holes in log 1 Pins supplied in manual bag LOG NUMBER 2 SRV589 703 Place lo...

Страница 27: ...between the 7th and 8th grate bars LOG NUMBER 4 SRV589 704 Position log number 4 so that its round hole fits over the protruding pin on the left side of log number 1 LOG NUMBER 5 SRV589 705 Put the f...

Страница 28: ...ake a few minutes for the lines to purge themselves of this air Once the purging is complete the fireplace will light and will operate normally Subsequent lightings of the fireplace will not require t...

Страница 29: ...burner neck Special attention should be given to the location of vermiculite Ensure that it remains in the base pan and away from the burner neck and orifice Checking Flame Patterns Flame Height Frequ...

Страница 30: ...32 omeowner s Notes...