
17
Figure 15
B. INSTALLING VENT COMPONENTS
VENTING OUT THE REAR VENT
Remove the installed rear seal cap from the rear starting
collars (see Figure 15). Follow the vent configuration tables
accordingly.
WARNING: THE TOP VENT COLLAR HEAT
SHIELD (SUPPLIED WITH THE FIREPLACE) MUST
BE ATTACHED TO COVER THE TOP STARTING COL-
LARS IF THE VENT SYSTEM IS ATTACHED TO THE
REAR STARTING COLLARS. SEE FIGURE 15.
VENTING OUT THE TOP VENT
Remove the top vent collar heat shield covering the starting
collars (see Figure 15). Next remove the installed top vent
collar sealing cap, vent pipe insulation, glass door, packaged
logs, and grate assembly from inside the firebox.
Remove the exhaust baffle and the exhaust shield from the
inside of the firebox. (See Figure 15).
The exhaust baffle is fastened to the top and back of the
firebox with 4 screws. The exhaust shield is also fastened
with 4 screws . You must replace these four screws and
discard the exhaust shield. Replace the exhaust baffle, re-
position the grate assembly, position the logs, and re-install
the glass door. Attach vent system to the top starting vent
collars.
WARNING: THE REAR VENT COLLAR SEAL
CAP MUST REMAIN ATTACHED TO THE REAR
VENT COLLARS IF THE VENT SYSTEM IS AT-
TACHED TO THE TOP STARTING COLLARS. SEE
FIGURE 15.