12
30
36
42
48
60
18
24
TABLE 2
SUCTION LINE LENGTH AND CAPACITY MULTIPLIER
•
IMPORTANT:
Do not braze any fitting with the TEV sensing bulb attached.
•
Braze the tubing between the outdoor unit and indoor coil. Flow dry nitrogen
into a service port and through the tubing while brazing.
•
The service valves are not backseating valves. To open the valves, remove the
valve cap with an adjustable wrench. Insert a 3/16” or 5/16” hex wrench into the
stem. Back out counterclockwise.
•
Replace the valve cap finger tight then tighten an additional 1/2 hex flat for a
metal-to-metal seal.
7.7 LEAK TESTING
•
Pressurize line set and coil through service fittings with dry nitrogen to 150
PSIG maximum. Leak test all joints using liquid detergent. If a leak is found,
relieve pressure and repair.
13 SEER
Cooling
Capacity
25’
.98
.98
.99
.99
.99
1.00
1.00
1.00
1.00
1.00
1.01
1.01
1.01
1.01
1.01
.96
.96
.97
.97
.97
.99
.99
.99
1.00
1.00
1.00
1.00
1.01
1.01
1.01
—
—
—
.93
.93
.98
.97
.97
.99
.99
1.00
.98
.99
1.00
1.00
.93
.93
.93
.96
.96
.99
.98
.98
.99
.99
1.00
.99
1.00
1.00
1.00
Opt.
Std.
Opt.
Opt.
Std.
Opt.
Opt.
Std.
Opt.
Opt.
Std.
Opt.
50’
100’
150’
3/4” I.D. Sweat
7/8” I.D. Sweat
7/8” I.D. Sweat (4)
5/8” O.D. Optional
3/4” O.D. Standard
7/8” O.D. Optional
3/4” O.D. Optional
7/8” O.D. Standard
1-1/8” O.D. Optional
7/8” O.D. Optional
1-1/8” O.D. Standard
1-3/8” O.D. Optional
Suction Line
Connection Size
Suction Line
Run Feet
NOTES:
1) Capacity Multiplier x Rated Capacity = Actual Capacity.
2) Additional Compressor oil is not required for runs up to 150 feet.
3) Oil traps in vertical runs are not required for any height up to 125 feet. See Liquid Line chart for Vertical Separation Requirements and Limitations.
4) Adapter to 1-1/8" Factory Supplied.