Heat & Glo • XLR-N-CE, XLR-PB-CE • 2198-900 Rev. L • 3/13
26
Figure 7.5 Vertical Vent Maximum
Note
:
If installing a vertical vent/termination off the top of the
appliance, the optional exhaust restrictor may be needed.
V
1
V
1
= 13,4 m
Top Vent - Vertical Termination
No Elbows
Note
: Use SLP Series
components only.
Exhaust restrictor Instructions
1. Locate the two pilot holes located in the inside firebox
heat shield as shown in Figure 7.6.
2. Center the exhaust restrictor such that the through
holes in the vent restrictor align with the pilot holes in
the heat shield.
3. Use (2) 1,3 cm self-piercing screws to secure vent
restrictor to firebox heat shield. See Figure 7.7.
Exhaust restrictors are recommended for these vertically
terminated products which have excessive draft. Exhaust
restrictors will compensate for high draft, and restore vi-
sual flame height. If the vent configuration has a total
vertical of 4,6 m - 13,4 m, an exhaust restrictor may be
needed. The exhaust restrictor can be located in the ap-
pliance manual bag.
Figure 7.7 Exhaust Restrictor Installation
Figure 7.6 Location of Pilot Holes
PILOT HOLES
NOTICE:
Before painting, contact your dealer for informa-
tion on the appropriate high temperature paint.
4. In some applications, such as those where the fire-
place is elevated off the floor, the vent restrictor may
be painted, but painting is not required.