background image

8

Hearth & Home Technologies  •  HEAT-OUT-GAS Instructions •  2310-939  •  3/17

Figure 2.4

B.  Installing Vent Cap

1.  Remove the four screws holding the shipping bracket to 

the base of the HEAT-OUT-GAS.  See Figure 2.4 and 
2.5.

2.  Remove the shipping bracket.  See Figure 2.6.
3.  The HEAT-OUT-GAS base should look like the picture 

in Figure 2.7.

4.  Cut a 7" diameter hole in the outside of building where 

the duct for the HEAT-OUT-GAS is to be located.  Refer 
to Figure 2.1 for duct location on HEAT-OUT-GAS.

 

Figure 2.5

Figure 2.6

Figure 2.7

NOTE: 

•  The HEAT-OUT-GAS may be painted to a desired 

color, as long as the paint selected has suf

fi

 cient 

temperature and environmental ratings. 

•  Thoroughly sand the existing coating prior to 

painting with sand paper or steel wool.

•  The front of the cap cover may be 

fi

 eld-painted 

and cured up to 400 degrees Fahrenheit (204° 
C).  

•  Certain areas of the cap surface may reach up to 

250 degrees Fahrenheit (121° C).  Paints selected 
should have suf

fi

 cient temperature ratings.

Содержание HEAT-OUT-GAS

Страница 1: ... national codes and reg ulations IMPORTANT Failure to read and follow these instruc tions may create a possible hazard and will void the fire place warranty These instructions must remain with the equipment CAUTION Failure to install operate and maintain the power venting system in accordance with manufacturer s instructions will result in conditions which may produce bodily injury and or property...

Страница 2: ... 4086 316 1 Wall Switch Plate 2155 511 1 Wall Switch 2310 210 1 Vinyl Siding Shield 4086 140 1 Blower Assembly 4086 301 1 Junction Box Assembly 4086 303 1 Capacitor 4086 315 1 C Kit Contents of HEAT OUT GAS 659 200 6 Inch Round Duct 659 125 Unit Collar 2155 511 Wall Switch Plate 4086 316 Damper Assembly 4086 140 Vinyl Siding Shield 2310 210 Wall Switch 4086 022 Cover Assembly 4086 021 Blower Base ...

Страница 3: ... minimum of one inch clearance around uninsulat ed pipe must be maintained to all combustible surfaces Note Support duct at intervals of no greater than 4 feet with no more than 1 2 sag between supports as required by local code Tape all seams with aluminum tape 1 1 4 minimum width or as specified by local codes D Installation Guidelines The HEAT OUT GAS accessory is tested and safe when installed...

Страница 4: ...ies to attach the flex duct to the damper Verify damper is operational and no obstructions such as screws are present OPTIONAL HEAT OUT GAS LOCATION OPTIONAL HEAT OUT GAS LOCATION TYPICAL SINGLE SIDED APPLIANCE OPTIONAL HEAT OUT GAS LOCATIONS Q TYPICAL SEE THROUGH APPLIANCE HEAT OUT GAS Configuration NOTICE Damper MUST be installed properly or it will not function properly Vertical Mounting Instal...

Страница 5: ...HO GRADE 12 IN MIN 24 IN MIN 24 IN MIN 6 IN MIN PV PVLP SLP HO HEAT OUT GAS Figure 1 4 Minimum Clearances for Termination Possible Air Duct Runs Locations Maximum Duct Run Length 35 FT Minimum Duct Run Length 36 IN Clearance to flexible duct 0 Maximum Number of 90 Degree Elbows Turns 6 Figure 1 3 HEAT OUT GAS Locations ...

Страница 6: ... 5 7 8 in 149mm 10 1 8 in 258mm 14 1 8 in 360mm 7 8 in 21mm 6 7 8 in 175mm 4 in 103mm Mounting Hole Locations 12 5 8 IN 8 5 8 IN Framing Dimensions 1 Construct a framework as shown in Figure 2 2 Framework material should be the same dimensions as the material used for the wall framing The dimensions of the box must be 12 5 8 inches high by 8 5 8 inches wide NOTE Framing dimensions are for mounting...

Страница 7: ...ructions 2310 939 3 17 Roof Top Termination 1 If the HEAT OUT GAS is going to terminate on a flat roof an enclosure similar to the one shown in Figure 2 3 will need to be constructed Insulated Flex Duct 12 in 305 mm Figure 2 3 Flat Roof Enclosure ...

Страница 8: ...duct for the HEAT OUT GAS is to be located Refer to Figure 2 1 for duct location on HEAT OUT GAS Figure 2 5 Figure 2 6 Figure 2 7 NOTE The HEAT OUT GAS may be painted to a desired color as long as the paint selected has sufficient temperature and environmental ratings Thoroughly sand the existing coating prior to painting with sand paper or steel wool The front of the cap cover may be field painte...

Страница 9: ...8 X 3 INCH SCREWS RETURN BEND ON SECTION A LOCATED ON OUTSIDE OF SECTION B Figure 2 9 BEK Assembled 5 Assemble the Heat Out BEK kit Bend the two sections of the Heat Out BEK kit as shown in Figure 2 8 6 Use the formed tabs to assemble the box as shown in Figure 2 9 The return bend on section A should be located on the outside of section B 7 Place assembled box over the framed opening in the wall w...

Страница 10: ...UT GAS and HEAT OUT BEK meet as shown in Figure 2 13 If installing with HEAT OUT BEK skip to step 17 15 Place a bead of silicone with a minimum of 300 F continuous exposure rating on the back side of the mounting flange for the heat out See Figure 2 14 16 Install the heat out into the wall and attach the cap to the wall using the four self piercing 10 x 1 2 inch screws provided See Figure 2 15 13 ...

Страница 11: ...er 20 Install the decorative front cover onto the Heat Out base using the seven 8 x 1 2 Phillips head screws provided in the kit See Figure 2 18 and 2 19 Figure 2 18 Figure 2 19 21 Once the decorative front cover is installed apply a bead of silicone with a minimum of 300 F continuous exposure rating between the decorative cover and the finishing material around the cap See Figure 2 20 Figure 2 20...

Страница 12: ...Seal core to collar with at least 2 wraps of duct tape Secure connection with clamp placed over the core and tape and past the bead 2 Tape cores together with at least 2 wraps of duct tape Secure connection with 2 clamps placed over the taped core ends and past the beads 3 Pull jacket and insulation back over core Tape jacket with at least 2 wraps of duct tape A clamp may be used in place of or in...

Страница 13: ...erformed at this time in order for the HEAT OUT GAS to be recognized by the appliance Refer to the IntelliFire Touch remote control instructions included with the appliance The HEAT OUT GAS kit will be controlled by the FAN icon on the IntelliFire Touch remote as seen here FLAME SENSE IGNITER TO JUNCTION BOX 110 120 VAC LED CONTROL IF APPLICABLE RF MODULE ORANGE PILOT IFT RC400 REMOTE CONTROL IFT ...

Страница 14: ...3 2 Wiring Diagram HEAT OUT GAS Please contact your Hearth Home Technologies dealer with any questions or concerns For the location of your nearest Hearth Home Technologies dealer please visit www hearthnhome com Hearth Home Technologies 7571 215th Street West Lakeville MN 55044 www hearthnhome com ...

Отзывы: