Healy VP1000-5 Скачать руководство пользователя страница 4

4

Introduction to the Guide

The purpose of this guide is to inform installers, operators, and other personnel about the CARB certified VP1000-5 

vacuum pump for Phase II (Stage II) vapor recovery systems. For complete installation, operation, and maintenance 

details refer to CARB Executive Order VR-201 or other applicable VP1000-5 documentation.
A Healy EVR Phase II system in California includes one VP1000-5 vacuum pump per dispenser, one Clean Air 

Separator (CAS) per site, and the appropriate Healy hanging hardware, including Model 900 nozzles, at each fueling 

point per CARB Executive Orders VR-201 and VR-202.
A Healy Phase II System outside California in North America includes one VP1000-5 vacuum pump per dispenser 

and the appropriate Healy hanging hardware, including Model 800 nozzles, at each fueling point per CARB Executive 

Order G-70-191-AA.

Notes:

•  Installation and service of system components, including testing and replacement of such components, shall 

be performed by technicians certified by the appropriate manufacturer. Additionally, the technician must be 

skilled with thorough knowledge of applicable State, Federal, and local requirements of installation and repair of 

gasoline dispensing equipment, including safety precautions.

•  All VP1000-5 warranty service must be completely documented by the technician on the VP1000 Returned 

Goods Product Tag (FFS-0120). See Appendix G for further information.

Содержание VP1000-5

Страница 1: ...anklin Fueling Systems 3760 Marsh Rd Madison WI 53718 USA Tel 1 608 838 8786 800 225 9787 Fax 1 608 838 6433 www franklinfueling com Manual Revision Date Changes from Previous Revision 405291001 2 Mar...

Страница 2: ...Under Current Fault Troubleshooting 8 Section Four Over Current Fault Troubleshooting 9 Section Five VP1000 5 Performance Testing 10 Appendix A VP1000 5 Installation and Testing 12 Appendix B Side B...

Страница 3: ...environment or by using any other reasonable means available to ensure the safety of service personnel Follow all federal state and local laws governing the installation of this equipment When no oth...

Страница 4: ...202 A Healy Phase II System outside California in North America includes one VP1000 5 vacuum pump per dispenser and the appropriate Healy hanging hardware including Model 800 nozzles at each fueling...

Страница 5: ...nstalled per dispenser to accommodate the vapor recovery needs for both sides of the dispenser When the dispenser is authorized the MC100 1 will activate the VP1000 5 simultaneously and run at a low s...

Страница 6: ...oduct The MC100 1 s solenoid disconnect relay provides interruption of the solenoid valve neutral circuit when the VP1000 5 is in a fault state Figure 2 describes the meanings of the indicator lights...

Страница 7: ...Performance Testing in Section 5 Is a fault condition present on the MC100 1 Reset the system by removing the white reset plug on the MC100 1 for a minimum of 20 seconds Re insert the white reset plu...

Страница 8: ...er VR 201 No Verify the performance of the VP1000 5 per B 5 of the A B sheet Refer to Appendix B Yes Is the vacuum level produced by the VP1000 5 between 60 90 WC Disconnect the white reset plug on th...

Страница 9: ...the VP1000 5 between 60 90 WC Disconnect the white reset plug on the MC100 1 Remove the VP1000 5 front cover to evaluate the rotor vanes for wear and or damage Refer to Appendix C Check for debris and...

Страница 10: ...mance of the VP1000 5 per B 5 of the A B sheet Refer to Appendix B Is the vacuum level produced by the VP1000 5 between 60 and 90 WC Disconnect the white reset plug on the MC100 1 Remove the VP1000 5...

Страница 11: ...e VP1000 5 increase from low to high speed when both sides of the dispenser are activated Verify the wiring of the MC100 1 Refer to Appendix E No Retest Continued from previous page Remove the vacuum...

Страница 12: ...ow shows a vacuum gauge face with the acceptable vacuum level highlighted when measured with a VP1000 5 vacuum pump The acceptable vacuum level from the VP1000 5 is between 60 and 90 WC Readings of 3...

Страница 13: ...est until all leaks have been repaired 8 Record data in Section B 4 Note If the initial vacuum reading is less than 60 wc it could indicate a problem with the VP1000 Remove the dispenser from service...

Страница 14: ...e damage use a lint free cloth with isopropyl alcohol to clean the rotor and vanes 9 Using a lint free cloth with isopropyl alcohol thoroughly clean the inside of the pump ring and rear of the pump ca...

Страница 15: ...activate Note For unihose dispensers conduct individual tests for each product grade on each side of the dispenser to ensure that the same LED activates for all grades on the same side If the other L...

Страница 16: ...C should be measured between either red and orange wires When no fault is present 5VDC should be measured between purple and orange wires When fault is present 0VDC should be measured between purple a...

Страница 17: ...ACH and JUMPER terminals to create a short 3 With the jumper wire in place re insert the white reset plug The yellow power light should now be illuminated 4 Authorize a nozzle on Side A of the dispens...

Страница 18: ...P1000 MC100 interface check one Red Light is FLASHING over current Red Light is SOLID under current Red Light is OFF Dispenser Integrity inches of water column Starting Vacuum ________ Ending Vacuum _...

Страница 19: ...19 2012 FFS 405291001 Rev2...

Отзывы: