Cleaning
operations
Disinfection
operations
Use of other
disinfectants
Remove the mattress and any accessories from the bed.
Head/foot boards and mattress platform sheets should be removed from
the bed for cleaning.
Wearing suitable protective clothing, clean all surfaces with a disposable
cloth moistened in hand hot water and a neutral detergent.
Start by cleaning the upper sections of the bed and work along all
horizontal surfaces. Work methodically towards the lower sections of the
bed and clean the wheels last. Take extra care to clean areas that may trap
dust or dirt.
Wipe over with a new disposable cloth moistened with clean water, and
dry with disposable paper towels.
Allow the cleaned parts to dry before replacing the mattress.
After cleaning the bed as described above, wipe all surfaces with sodium
dichloroisocyanurate (NaDCC) at a concentration of 1,000 parts per million
(0.1%) of available chlorine.
In the case of pooling body fluids, e.g. blood, the concentration of NaDCC
should be increased to 10,000 parts per million (1%) of available chlorine.
The manufacturer recommends sodium dichloroisocyanurate (NaDCC) as a
disinfectant because it is effective, stable and has a fairly neutral pH. Many
other disinfectants are used in healthcare facilities, and it is not possible
for the manufacturer to test each one to determine whether it may affect
the appearance or performance of the bed.
If facility protocols require the use of a disinfectant other than NaDCC (e.g.
diluted bleach or hydrogen peroxide), it should be used with care and in
accordance with the manufacturer’s instructions.
Preventive
maintenance
This product is subject to wear and tear during use.
To ensure that it continues to perform within its original specification,
preventive maintenance procedures should be carried out at the intervals
shown.
IFU-HBB500-ENG-2021#ed02-May
49
Содержание HBB500
Страница 6: ...General Warnings Continued on next page IFU HBB500 ENG 2021 ed02 May 6 ...
Страница 7: ...Continued on next page IFU HBB500 ENG 2021 ed02 May 7 ...
Страница 8: ...IFU HBB500 ENG 2021 ed02 May 8 ...
Страница 47: ...Duty Cycle Lockout Duty cycle is 10 MAX 2min ON 18min OFF IFU HBB500 ENG 2021 ed02 May 47 ...
Страница 57: ...Protective earth ground Recommended mattress size Recommended patient height IFU HBB500 ENG 2021 ed02 May 57 ...