Health Craft Advantage-Rail series Скачать руководство пользователя страница 2

We strongly recommend that you give thought as to the optimal
location of your Advantage-Rail before installation. HINT - pre-
assemble the Advantage-Rail without installing the locking pin
so that different rail heights and locations may be tested. Next
install the locking pin at the desired height to determine the
locking positions. In addition, the following questions may help
you to decide upon a location:

a. What motions will you be going through? (pulling up to
standing, lowering to sitting, transferring from chair to toilet, etc.)

b. What is the most comfortable horizontal rail height for you -
30”, 32”, 34”, 36” or 38" ( 75, 80, 85, 90 or 95 cm?)

c. What is your strongest side/hand?

d. What is your complete transfer path? Will the location allow for
full support over most of your path of motion?

e. Will the rail be far enough away to allow you to stand
comfortably?

f. Does the Advantage-Rail

line up with an appropriate location

of the floor in the proposed location (i.e. on floor joist, on tile grout
seam, etc)

TM

TM

TM

Locate unit adjacent to hip/belt line and as close to
bed as possible while allowing clearance for bed
coverings. You will need to set the pivot locking
positions of the bar. As a suggestion, positions A
and E are good for moving in bed, B for pulling up to
sitting, C for pulling up to standing and D for
transferring out of bed.

Toilet

Bathtub only

- suggested to locate unit between three to ten

inches forward of the knees and two to six inches to
side of knees when seated.

- locate

base against tub, approximately half way along its
length. You will need to set the pivot locking
positions of the bar. As a suggestion, positions B or
D are suitable for standing from toilet, C and F for
transferring into bathtub, E and D for transferring out
of bathtub.

IMPORTANT - Fasteners used for securing the
Advantage-Rail to the floor require an installed
retention force rating of at least 800 lbs / 360 kg
each.

For installation on concrete floors, a 5/16" sleeve type
anchor is recommended. Follow manufacturers
recommendations for proper installation.

For wood deck floors, a bolt/nut/washers
combination is recomended. If a wood support
beam is present, install a wood lag screw in those
hole locations over the beam, ensuring at least a
3"/7cm thread engagement, and suitable condition
of the wood beam to prevent pull-out.

TM

Bed

Location Suggestions...

B

D

A

C

F

E

A

B

C

E

D

Bathtub and/or Toilet

Floor Fasteners

Floor Fasteners

Installation Notes

Installation Notes

mast

concrete
sleeve
anchor

concrete

concrete sleeve
anchor
(min 5/16" dia)

hex nut

Adv. Rail Base

Split lock washer

washer (USS style)

hole drilled for
sleeve anchor

hex cap head
wood lag screw

3"/7 cm
minimum
thread
engagement

Adv. Rail Base

Split lock washer (qty 2)

washer (USS style)

wood
floor
deck

support
beam

Adv. Rail Base

Split lock washer
(qty 2)

hex lock nut

Split lock washer

hex head bolt
(min 5/16")

washer (USS style)

washer (USS style)

wood
floor
deck

Concrete Floor

Installation

Sleeve Anchor

Detail

Wood Lag Screw

Detail

Bolt/Nut/Washer

Detail

mast

bolt

wood lag

screw

(if over
beam)

Adv. Rail base

wood floor deck

support
beam

Wood Deck Floor

Installation

Отзывы: