UK
Disc-Roller 2,5 - 3,0 – 3,5 - 4,0 m (1-section) 12/08-2014
17
Maintenance and service
A.
Grease hubs at the discs so that grease is appearing at the seals of the hubs.
Every 30 hours of operation grease again. If the machine is driving under difficult
conditions (much dust), grease more often.
Important:
B.
After 10 hours of operation, retighten wheels, bearings and stop rings. Check hydraulic
hoses, fittings and cylinders for leaks and retighten.
C.
Every 10 hours of operation, grease all pivoting points in side sections, drawbar and wheel
assembly.
D.
After end season, grease and wash machine.
Important:
Oil, type Hydro Texaco HD 32 has been
filled in the hydraulic system.
Grease hubs at the discs before wash,
to avoid water penetration into the bearings.
Grease piston rods.
Содержание Disc Roller 2,5m
Страница 2: ......
Страница 24: ...UK Disc Roller 2 5 3 0 3 5 4 0 m 1 section 12 08 2014 24 Disc 7 12 13 10 9 6 5 2 3 4 14 1 8 11 13...
Страница 36: ...UK Disc Roller 2 5 3 0 3 5 4 0 m 1 section 12 08 2014 36 Spring Board 2 5m 3 0m 3 5 m...
Страница 37: ...UK Disc Roller 2 5 3 0 3 5 4 0 m 1 section 12 08 2014 37 Spring Board left 4 0m...
Страница 40: ...UK Disc Roller 2 5 3 0 3 5 4 0 m 1 section 12 08 2014 40 El depth stop for disc...
Страница 45: ...UK Disc Roller 2 5 3 0 3 5 4 0 m 1 section 12 08 2014 45 Air brakes...
Страница 57: ...UK Disc Roller 2 5 3 0 3 5 4 0 m 1 section 12 08 2014 57 Diagrams El depth stop...
Страница 58: ...UK Disc Roller 2 5 3 0 3 5 4 0 m 1 section 12 08 2014 58 Lights...
Страница 60: ...The design is subject to modification without notice...