7 Cleaning and maintaining the heating system – Procedure
82
7.
Remove the deposits on the heat exchanger surfaces (1) using an
appropriate tool.
8.
Remove the falling ashes in the front through the combustion
chamber door.
See the “Cleaning the flame channel and ash compartment”
section in this chapter.
9.
Reinstall the flue gas deflector plate by reversing the sequence of
steps.
10.
Close the boiler in the reverse sequence.
11.
Insert the plug of the flue gas fan into the plug board.
The cleaning of the heat exchanger surfaces is completed.
C
LEANING
THE
FLUE
PIPE
1.
Allow the fire in the boiler to burn out and cool off.
6.
Sweep any deposits into the flue gas collection box, but not in the
direction of the boiler.
7.
Refit the inspection hatch (2) securely onto the flue pipe (3) with
the wing nut (1).
The cleaning of the flue pipe is completed.
Caution!
See the “General safety instructions” section in this chapter.
2.
Release the wing nut (1) on
the inspection hatch (2).
3.
Remove the inspection hatch
(2) from the flue pipe (3).
4.
Check whether the flue pipe
(3) needs cleaning.
5.
If necessary, suction the ash
out of the flue pipe using a
vacuum cleaner (3).
Figure 7/9 - Cleaning the flue pipe
1
2
3
Содержание Turbotec 50 L
Страница 1: ...hdg bavaria com HDG Turbotec with HDG Lambda Control 1 Operation Manual ...
Страница 2: ......
Страница 6: ...6 ...
Страница 10: ...10 ...
Страница 22: ...3 Mode of operation Declaration of conformity 22 3 5 Declaration of conformity ...
Страница 94: ...94 ...
Страница 99: ......