Contents
Stacking with a Control System
Ports essential to building a stack
Controlling the stack with a uControl Zone Processor
8x24 wiring diagram: video only
8x24 wiring diagram: cabling for IR Cascade
Sanity check hardware and connections
Ensure that the Zone Processor is on and connected to LAN
Make sure uControl is on the latest software
Tell uControl what ZP will become your Controller
IMPORTANT STEP: Add devices to your stack and setting their Stack Layer
uControl will gather data from all systems and prepare the ZP for configuration
If the background colour changes then you have accessed the ZP
3
Содержание MHUB S
Страница 1: ...Quick Start Guide Stacking MHUB S 1 ...
Страница 6: ...6 ...
Страница 10: ...8x24 wiring diagram video only 10 ...
Страница 12: ...8x24 wiring diagram cabling for IR Cascade 12 ...
Страница 16: ...Image Gallery Connect to System Select the Stack option 16 ...
Страница 17: ...Setting Stack Layer order Accessing uOS 17 ...
Страница 18: ...Select uControl Provide a System Names 18 ...
Страница 19: ...Select Manual Creating a Connection 19 ...
Страница 20: ...Name your devices Create a Zone 20 ...
Страница 21: ...Select uControl 21 ...