![HBS GQ-20A1 Скачать руководство пользователя страница 15](http://html1.mh-extra.com/html/hbs/gq-20a1/gq-20a1_installation-manual_2111991015.webp)
17. Connect the power supply to the user-supplied voltage, check the circuit breaker,
make sure it is switched "on" position to ensure the standard power supply function, as
shown below.
18. SYSTEM STARTUP PROCEDURE
Caution! Please strictly follow this order.
1. Press the "Control Power" button.
2. Turn on the "Laser Power" switch.
SYSTEM SHUTDOWN PROCEDURE
Caution! Please strictly follow this order.
1. Turn off the "Laser Power" switch.
2. Press the "Control Power" button.
Содержание GQ-20A1
Страница 1: ...HBS GQ 20A1 Laser Marking System Installation Guide HBS Tech...
Страница 5: ...6 Open doors on both sides of the top cover to facilitate the tightening screw process as shown below...
Страница 7: ......
Страница 10: ......