Assembly Instructions M8100-EN
M8100-EN 2018-03
2/8
1.
Proceed as follows in order to cool down the unit and empty
the mould (mould evacuation)
Display menu page
Functions
.
Select the function
Cooling
and activate with the
key.
Select the function
Mould evacuation
and activate with the
key.
The activated function is indicated with the
symbol.
2.
Main switch off, remove the plug from the mains and empty
the unit.
3.
Remove control cable to ext. flow rate meter Flow-5.
Fig. 1: Front side of the evaluation unit
Fig. 2: Rear side of the evaluation unit
4.
Proceed as follows in order to remove the cover of the
evaluation unit:
Remove screws (Label 1
Detach screws (Label 2
Lift the cover with the keyboard and pull out the ribbon cable.
Remove the cover with the keyboard.
Fig. 3: DFM-51 evaluation unit
5.
Proceed as follows in order to replace the printed circuit board
DFM-51 (A 9):
Pull out plug connections of printed circuit board DFM-51.
Remove screws (Label 3
Remove printed circuit board DFM-51 and insert new one in the
evaluation unit.
Attach screws (Label 3
Connect plug connections to the printed circuit board.
1
2
3