Assembly Instructions M8103-EN
M8103-EN 2020-01
2/4
with product group Thermo-5
1.
Proceed as follows in order to cool down the unit and empty
the mould (mould evacuation):
Display menu page
Functions
.
Select the function
Cooling
and activate with the
key.
If the function
Mould evacuation
is available, select it and
activate it with the
key.
The activated function is indicated with the
symbol.
Units HB-100X_4 and HB-100/140/160Z_4 without function
Mould evacuation
: Loosen the drain connection (G) slowly until
the unit is depressurized.
with product group Treat-5 / Clean-5
2.
Switch on Emptying tank function as follows:
Display menu page
Functions
.
.
Select the parameter
Emptying tank
and activate with the
key.
The active function is indicated with the
symbol.
3.
Main switch off, remove the plug from the mains and empty
the unit.
4.
Remove the cover from the unit (see Instruction Manual
Chapter Maintenance).
5.
Loosen the screws in the front panel and hinge it down.
6.
To remove pressure sensor (BP 1, 2), proceed as follows:
Disconnect the pressure sensor cable to GIF-51 (A 4), remove
the cable ties and completely remove the cable.
Pressure sensor system (BP 1)
connector X 31.1
Pressure sensor main line (BP 2)
connector X 31.2
Remove the hydraulic connection to the pressure sensor.
Remove the pressure sensor from the mounting bracket using a
hexagon nut.
7.
To mount the pressure sensor (BP 1, 2), proceed as follows:
Screw the pressure sensor with hexagon nut to the
mounting bracket and install the hydraulic connection. Lay the
pressure sensor cable through the cable duct and connect to
GIF-51 (A 4). Lay the pressure sensor cable through the cable
duct and connect to GIF-51 (A 4).
Pressure sensor system (BP 1)
connector X 31.1
Pressure sensor main line (BP 2)
connector X 31.2