Hayman Reese 03257RW Скачать руководство пользователя страница 1

 

 

TOWBAR 

INSTALLATION INSTRUCTIONS

 

PART NUMBER 

03257RW

 

KIA SPORTAGE QL MY19 CL4

 

 

 

49-75 Pacific Drive Keysborough, VIC 3173 
Phone: 1800 812 017 
Email: [email protected]

 

 

 

 

Rev: 

A

 

 

 

 

 

 

 

Page 

1

 

 

 

 

 

            Issue Date: 

03-05-19

 

 

 

PRODUCT DETAILS:

 

Part Number:

 

03257RW

 

Maximum Towing Braked:   

1900

 

kg 

ECU Number:  

04826

 

Maximum Towing Unbraked:  

750

 

kg 

Tail Harness Length Required: 

1200 mm

 

Maximum Static Ball Load: 

100 

kg 

TBM/Lug Part Number: 

 

21360

 

Wiring Part Number: 

 

101469-WL

 

 
 

FITTING DETAILS:

 

Towbar Installation Time: 

60 Mins.

 

Vehicle Coding Required: 

NO 

Wiring Installation Time: 

30 Mins.

 

RPA Disable/Other: 

YES 

Total Installation Time: 

90 Mins.

 

Note: 

Bumper Cut Required: 

Yes 

 

RPA Disable via switch on centre console. 

 

 

 

Содержание 03257RW

Страница 1: ...Maximum Towing Braked 1900 kg ECU Number 04826 Maximum Towing Unbraked 750 kg Tail Harness Length Required 1200 mm Maximum Static Ball Load 100 kg TBM Lug Part Number 21360 Wiring Part Number 101469...

Страница 2: ...sible bumper front of corner upwards Figure 2 Drilling For any required drilling during installation ensure that the area is clear of fuel electrical other components that may be damaged All holes dri...

Страница 3: ...6 SET SCREW HEX HD M5x20x0 8P 2 4 CHASSIS NUT PLATE ASSY 2 17 NUT NYLON INS LOCKHEX HD M5X0 8P 2 5 BUMPER TAB 2 18 WASHER FLAT M6X12 5X1 2 4 6 SMART KEY ANTENNA BRACKET 2 19 TOWBALL 50MM FLAT CHROME 1...

Страница 4: ...anreese com au Rev A Page 4 Issue Date 03 05 19 1 Open tailgate and remove exposed plastic taillight trim cover Repeat for other side 2 Remove exposed 2 x Screws securing the taillight to the body 3 R...

Страница 5: ...19 5 In wheel arch remove 4 x Screws along the outer edge and 1 x Scrivet located on the inside of the wheel arch Repeat for other side 6 Under vehicle remove the mudflap and underbody trim secured wi...

Страница 6: ...disconnect any electrical connectors 10 Feed 1x Nut plate on wire and 1 x Nutplate into the chassis rail Loosely secure the side arm assembly to the side of the chassis rail with 2 x M12 bolts complet...

Страница 7: ...am to bumper 14 Where applicable release smart key antenna from impact beam 15 Detach wiring from impact beam then remove and discard impact beam from rear bumper 16 On outer surface of the bumper det...

Страница 8: ...confirm any noted vehicle colour wires with a multi meter to ensure the correct function is identified before soldering or scotch locking For vehicle wires denoted with two colours example RED GREEN...

Страница 9: ...d tail harness connector stay inside the vent cavity Refer to the trailer patch harness grommet orientation 22 Inside the LHS rear quarter vent cavity secure the trailer patch ground ring terminal 1 t...

Страница 10: ...cle harness mating 12 way connector 4 26 At the rear exterior of the vehicle leave enough length on the tail harness so the plug can be mounted later 27 Route the tail harness tail length 1200mm 2 acr...

Страница 11: ...Route the power harness 1 along the LHS chassis rail towards the LHS rear quarter of the vehicle Connect the power harness 1 way connector to the trailer patch 1 way mating connector Keep harness rou...

Страница 12: ...rse order 37 Where applicable secure smart key antenna to smart key antenna brackets 38 Secure loose wiring to towbar using cable ties 39 Secure the 2 x bumper tabs to the bumper with 2 x scrivets and...

Страница 13: ...lass fasteners Inspection should be requested to coincide with vehicle major services 3 It is the owner s responsibility to ensure towing and down ball weight capacities of the towing vehicle are not...

Страница 14: ...properly installed and Smart pin nut is installed and tensioned Replacement parts are available from your Hayman Reese Distributor TOWBALL MOUNT REMOVAL INSTALLATION STEP 1 Insert Trailer Ball Mount T...

Отзывы: