INSTALLATION PROCEDURE...
STEP 2:
Install waste, supply and electrical lines in locations shown in Installation Drawing.
Waste and supply lines may be installed for either rear or side entry. Verify proper
waste, supply, electrical and frame locations. Use level to verify horizontal and
vertical frame mounting to insure proper bowl drainage.
STEP 3:
Installation Drawing shows fountain bowls, back panel and grille locations. Unpack
bowls and remove bottom plates using 5/64” hex allen wrench. Install back panel on
frame with narrower edge to bottom. Position nut retainers into mounting frame and
use two 5/16-18x1 hex head screws partially started in outside holes to support
panel. Install bowl/bracket assembly onto panel using eight 5/16-18x1 hex head
screws hand tightened. See sheet 2 of Installation Drawing for appropriate bowl
mounting pattern to use for this model.
STEP 4:
Remove 1-
1/4” IPS outlet elbow from traps as supplied. Install elbow inside frame
onto waste stub-outs.
STEP 5:
Assemble waste trap onto bowl strainer using seal washer provided and tighten nut
hand tight.
STEP 6:
See Figure 1 for detail section view of side screw grille attachment. Unpack grille and
insert upper lip behind bottom of back panel, align sides and hold up flush to bottom
of back panel. Hold grille against wall and mark centers of grille side slots on wall.
Masking tape may be used to
prevent finished wall damage from mark. Install the “s”
clips in mounting frame using #10 sheet metal screws into pre-drilled holes on lower
end of each side of frame. Tighten #10 screw while holdin
g “s” clips centered on wall
marks. Check grille fit by installing grille and partially tightening #6-23 socket head
screws through side of grille. Ensure proper panel and grille alignment, then tighten
eight 5/16-18x1 hex head screws.
STEP 7:
Unpack and remove chiller from carton. Remove front panel screws and panel. Do
not remove insulating putty and foam from copper tubes or Styrofoam insulation from
evaporator coil. Remove any inner packing, which may be around compressor. If
applicable, remove junction box cover and electrical knock out on lower right side of
housing. Install fittings (supplied) on chiller inlet and outlet tubes (see Installation
Drawing).
STEP 8
: Thoroughly flush supply line to remove all foreign matter. Connect 1/2" IPS supply
screwdriver stop to stub-out in wall. Place chiller on chiller support tray against right
hand side, fully to rear, with condenser (open panel) side facing to front. Install
supply 3/8” O.D. tubing (not supplied) between screwdriver stop and chiller inlet. (Cut
tubing to proper length and follow general notes for proper connection procedures for
push-in type fittings). Tubing insulation is not normally required on inlet side of chiller.
Install insulated tube between fountain and solenoid valve outlet. Cut tubes as
required and connect to chiller outlet compression tee assembly. Open screwdriver
stop
wide open
while checking for leaks at all connections. Push fountain operator
to fill chiller and remove air from tubing.