hd 650 D/DE EcoPak
D
Chapter 3
9.693.004
Page 10
V 5.01
3 Basic functions
3.1
Operation
Plug the mains cable into the mains connection.
Switch on the device with the mains switch in position "1".
The indicator light in the switch is lit.
Set the required sealing temperature on the temperature controller as described in Chapter
3.3.
The device is heated up and ready for operation as soon as the set sealing temperature is
displayed.
Mains connection with fuse
Controller
Содержание hd 650 D EcoPak
Страница 1: ...9 693 004 OPERATING INSTRUCTIONS Valid for device versions hd 650 D DE EcoPak hd 650 D DE EcoPak...
Страница 21: ...hd 650 D DE EcoPak D Chapter 5 9 693 004 Page 21 V 5 01 5 2 Switching and wiring diagram 115V...
Страница 23: ...hd 650 D DE EcoPak D Chapter 6 9 693 004 Page 23 V 5 01 6 Declaration of conformity...
Страница 25: ......