![Hawle 490K Скачать руководство пользователя страница 2](http://html1.mh-extra.com/html/hawle/490k/490k_operating-instructions_2109922002.webp)
05/2016
Subject to change
Page 2 of 2
4. Service and maintenance
The shortening set for Hawle freeflow underground hydrants is maintenance-free.
5. Commissioning and pressure testing
•
Open cover
•
Mount hydrant standpipe according to DIN 14375-1
•
Extend hydrant standpipe with hose
•
Lay the hose in such a way that water is safely drained off
•
Slowly open hydrant
•
Perform pressure testing as visual inspection at operating pressure
•
Perform a function test by completely opening and then closing the hydrant
•
After closing the hydrant, dismantle the standpipe and hose line
•
Check whether hydrant drains completely
If you have any other questions or if you need more information please contact:
Hawle Armaturen GmbH
- Application Engineering -
Liegnitzer Str. 6
83395 Freilassing
Phone: +49 (0)8654 6303-0
Telefax: +49 (0)8654 6303-222
E-Mail: [email protected]
Web: www.hawle.de