background image

Note:

Tape armour must be 

re-trimmed at 90° to the 

vertical axis of the cable 
after it has been spread,

to ensure that the full 

face is correctly 

presented.

I

Braid 'X',

Flat Steel Wire 'Y',

Steel Tape 'Z'

Ring Position

SWA

Position

General identification ring orientation for:

Reversible Armour Clamping Ring (RAC)

Gland Type: PSG 553/RAC
Exdb IIC Gb, Exeb II Gb, Extb IIIC Db
Baseefa06ATEX0056X       II 2 GD IP66
IECEx BAS06.0013X
IEx 14.0272X
EAC ТC RU C-GB.ГБ05.B.00750
CNEx07.0897X

Certification Details

Assembly Instructions for cable gland: 

PSG 553/RAC

Operating temperature range  -60°C +80°C

Note:

  Cable acceptance sizes are marked on the 

diaphragm seal, clamping ring and backnut.

www.ehawke.com

UK Office
Oxford Street West,
Ashton-Under-Lyne,
Lancashire.  OL7 0NA.  UK

Sales: +44 (0) 161 830 6698

Technical: +44 (0) 161 830 6697

Fax: +44 (0) 161 830 6648

E-mail: [email protected]

Connection Solutions

AI 312 - Issue R / Page 1 of 2

A member of the Hubbell Group of Companies

AI 312 / Issue R - 06/17

IMPORTANT

: The arrowhead indicating the 

correct armour thickness or type should point 

towards the equipment

Hawke International is a division of Hubbell Ltd.
Registered No. 669157 in England.  Registered Office:
Cannon Place, 78 Cannon Street, London EC4N 6AF.

1. Backnut
2. Middle Nut

3.  Reversible Armour Clamping Ring (RAC)

4. Armour Spigot
5. Seal
6.  Entry (with captive deluge seal), if required

Cable Preparation

A

Strip Cable to suit equipment as shown above and
expose the armour/braid '

I

' removing all cable fillers.

'

I

' = 20mm for cable gland sizes Os to C

'

I

' = 25mm for cable gland sizes C2 to F

'

II

' = to suit equipment.

If required, fit shroud.

C

Remove the inner seal 

 from the entry 

.  Place

the entry 

 over the armour spigot 

. Move the

sub-assembly 

 and 

 up to meet the entry 

.

B

Push the cable through the armour spigot 

. Spread

armour/braid over the armour spigot 

 until the end

of the armour/braid is up against the shoulder of the
armour cone. Position the armour clamping ring 

.

Gland Preparation

Shroud Option

II

I

Armour/braid

5

6

4

3

2

1

3

2

1

3

2

1

4

6

5

3

2

1

4

MACDEM

P. O. Box 16, Moscow, 119571, Russia

Email: [email protected]

Tel / Fax: +7 595 778 1264

Website: www.macdem.ru

For any enquiries within EAC countries, 
please contact:

Product supplied may differ 

slightly from that shown.

Images are for illustration 

puproses only. 

Отзывы: