background image

 

 

 

 

HawkExcavator.com 

 

 

1.2 OPERATING CONDITIONS  

The  hydraulic  amphibious  excavator  AT300-V2/AT300PS-V2  is  strongly  recommended  for 

working on wet ground, marshland, and shallow water. To avoid overturning and damage, the 
amphibious  excavator  must  be  operated  strictly  in  accordance  with  the  following  allowable 
conditions: 

1.2.1 ALLOWABLE CONDITIONS  

1. 

Work on wet ground, marshland, and shallow water.  

2. 

The machine can travel and work in water not deeper than 2 meters, and work normally 
under the following conditions:  

a)  The water flow speed: is 24 m/min (1.31 feet/second) or less.  

b)  The wave height: is 0.1m (3.93 in) or less.  

c)  The wind speed: is 240 m/min (8.94 mph) or less. 

  

1.2.2 NON-ALLOWED CONDITIONS  

1. 

Do not operate the machine on stumps, hard stones, or uneven ground that is frozen 
and solid, when mounted with additional pontoons.  

2. 

Do not attempt to operate the excavator when completely floating in water.  

3. 

Do not travel over water of an unknown depth.  

4. 

Do not use a bucket larger than the designated one. Otherwise, it will affect the stability 
of the machine. The machine is only used for light loads and shouldn't be used for heavy 
loads.  

2.0 STRUCTURE  

The AT300-V2/AT300PS-V2 hydraulic amphibious excavator has four traveling devices (two 

traveling  motors  per  amphibious  undercarriage).  Figure  2.0  shows  a  simple  drawing  of  the 
structure of the machine.  

 

Side Pontoon  

Drive  

Shafts  

Spud  

Crossbeams  

Slewing  

Frame  

Pontoons  

Track Shoes  

and Chains  

Содержание AT300-V2

Страница 1: ...1 HawkExcavator com AT300 V2 AT300PS V2 AMPHIBIOUS EXCAVATOR OPERATION INSTALLATION AND MAINTENANCE MANUAL CERT NO TUV100 01 2043 ISO 9001 2015...

Страница 2: ...a thorough and systematic way to facilitate operation and maintenance The correct way of operation as well as proper and timely maintenance can fully develop the best performance of this machine impr...

Страница 3: ...EFORE USING A NEW MACHINE 7 3 1 1 INSPECT THE FOLLOWING ITEMS BEFORE OPERATING 7 3 2 OPERATING THE MACHINE 8 3 2 1 PRECAUTIONS 8 3 2 2 TRAVELING ON LAND 8 3 2 3 TRAVELING ON MARSHLAND 8 3 2 4 TRAVELIN...

Страница 4: ...CE 15 5 3 INSPECTION AND MAINTENANCE BEFORE OPERATING MACHINE 16 5 4 OTHER MAINTENANCE 17 5 4 1 TRAVEL DEVICE 17 5 4 2 TIGHTENING OF THE SLEWING FRAME MOUNTING BOLT 18 5 4 3 ADJUSTING TRACK TENSION AN...

Страница 5: ...A 2 SPUD POLE MOTOR QUANTITY 2 MOTOR SET HIGH QUALITY HYDRAULIC MOTOR ORIGIN KOREA 3 TRAVEL SPEED GROUND km h mph 0 3 2 0 1 9 MARSHLAND km h mph 0 2 0 1 2 IN STILL WATER km h mph 0 1 75 0 1 08 4 GRADE...

Страница 6: ...he wind speed is 240 m min 8 94 mph or less 1 2 2 NON ALLOWED CONDITIONS 1 Do not operate the machine on stumps hard stones or uneven ground that is frozen and solid when mounted with additional ponto...

Страница 7: ...e The operator can set the load time by working hours on display according to the lubrication chart and maintenance instructions Overloading will cause scratches on the hydraulic motors and during tes...

Страница 8: ...ially after long distance travel on water or land This can help to extend the life of the track chain and promote better travel performance 3 2 2 TRAVELING ON LAND 1 Clear the road using the bucket Th...

Страница 9: ...ther 3 2 5 ENTERING THE WATER 1 Check the water depth before launching the machine Do not directly launch the machine into the water as it may overturn 2 When entering the water the recommended launch...

Страница 10: ...AVOID EXCAVATION WORK WHILE FLOATING The amphibious excavator is designed to work on soft ground Therefore avoid letting it float in water while working Performing the digging operation while floatin...

Страница 11: ...forward position as shown in Figure 3 5 Figure 3 5 Landing the amphibious excavator 3 2 8 TRAVELING ON WATER AND UNDER A BRIDGE The machine can travel under a bridge A proper setting should be applie...

Страница 12: ...three way ball valves at the top been placed on the top of the side pontoons to activate the spud hydraulic cylinder or spud drive motor Extend the spud cylinder by switching the ball valves By using...

Страница 13: ...e motor to raise the spud up and down 4 These valves must be manually adjusted by the amphibious excavator operator 5 Once the spuds have been moved from the horizontal to the vertical position for op...

Страница 14: ...ontrol the travel lever to raise the spud until it reaches the limit plate Refer to Figure 3 10 3 Start traveling 4 0 MAINTENANCE Proper and timely scheduled inspections and maintenance are important...

Страница 15: ...e force and require frequent inspection and tightening 9 Avoid any scratches on the mating face of hydraulic components 10 Pipes hoses oil tanks and others must be cleaned before installation 11 Never...

Страница 16: ...IN PROGRESS sign in a place visible to others to avoid unwanted incidents Refer to Figure 5 1 Figure 5 1 Sign during inspection and maintenance 5 3 INSPECTION AND MAINTENANCE BEFORE OPERATING MACHINE...

Страница 17: ...rcarriage body and its parts a b Daily Do if necessary Oil change of the drive shaft gearbox a 3 months 1000 hours 5 4 OTHER MAINTENANCE 5 4 1 TRAVEL DEVICE Figure 5 2 shows the oil inlet and outlet o...

Страница 18: ...l until it reaches the horizontal oil level and a little comes out of the outlet plug Then close the plugs again and tighten them properly 5 4 2 TIGHTENING OF THE SLEWING FRAME MOUNTING BOLT Perform a...

Страница 19: ...ck chain Figure 5 5 Position of chain bolts and nuts Figure 5 6 Track chain tensioning After the tensioning process is completed it is necessary to grease the track chains so that the amphibious excav...

Страница 20: ...oad the amphibious parts carefully and make sure they are well placed and secure 6 2 ASSEMBLING THE MACHINE After unloading the transport the reassembly sequences are as follows 1 Get a crane of the r...

Страница 21: ...arriage bodies according to the correct position Use the locking pin to lock the crossbeams Refer to Figure 6 3 Figure 6 3 3 Move the second undercarriage unit to the preassembled unit Insert the unde...

Страница 22: ...the slewing frame mounting flange with the crossbeam mounting flange Refer to Figure 6 5 Figure 6 5 5 Tighten the slewing frame upper mounting flange onto the bottom mounting flange as shown in Figur...

Страница 23: ...body manufacturer Check the alignment of both the upper body swivel flange and the slewing frame flange and tighten all the bolts thereafter Refer to Figure 6 7 8NOS M30 x 60L hex bolt c w spring was...

Страница 24: ...lic hose connection from the slewing frame to the center joint 8 Follow the start up instructions provided with the operation manual for the upper body and start the machine Operate the hydraulic syst...

Страница 25: ...toon box beam into the S chamber of the pontoon 3 Lock the side pontoon by inserting the locking pin as shown in Figure 6 10 4 Connect the hydraulic system from the slewing frame two way ball valves t...

Страница 26: ...s from the undercarriage hydraulic cylinder brackets it is not necessary to remove the hydraulic cylinder from the slewing frame Use a rope to tie or hang the hydraulic cylinder to the slewing frame 3...

Страница 27: ...r taking the time to read this manual We hope you have a pleasant experience using our Amphibious Excavator AT300 V2 AT300PS V2 For any further information do not hesitate to contact us HawkExcavator...

Отзывы: