![Havis DS-APP-102 Скачать руководство пользователя страница 4](http://html1.mh-extra.com/html/havis/ds-app-102/ds-app-102_owners-manual_2108674004.webp)
www.havis.com • 1-800-524-9900
4
9
1. Zip Ties (5)
2. Keys (2)
3. 1/4”-20 x 5/8” long Button Head Screws (5)
4. M4 x 0.7 x 12mm long Pan Head Screws (5)
5. Washers, M4 (5)
6. Lock Washers, M4 (5)
Extra hardware (screws) provided
Tools required for installation:
• 5/32” Hex Drive
(For attaching Docking Station to Mount with Button Head 1/4”-20 Screws)
• #2 Philips Screwdriver
(For attaching Docking Station to VESA 75mm hole pattern equipment
with Pan Head M4 x 0.7 x 12mm Screws)
Hardware Kit
Port Replication Capability
Parts Included
TOP
of Docking Station
BOTTOM
of Docking Station
LED
Power Indicator
Operation - Docking
1)
Ensure Docking Station is unlatched by lifting Latch Handle.
2)
Hold tablet in landscape orientation, with bottom angled toward
Docking Station. Lower tablet into the bottom of the Docking Station.
DO NOT FORCE TABLET ONTO DOCKING STATION. IF THERE IS RESISTANCE,
CHECK ALIGNMENT OF TABLET ON DOCKING STATION.
Alignment Sockets
Back Side of Panasonic Toughpad FZ-A1
Alignment Posts
DS-PAN-500 Series Docking Station
NOTE: Ensure a proper connection by aligning the tablet’s
Alignment Sockets with the Docking Station’s Alignment Posts
Power Input
PWR
DC IN 12V