![Haspo 114 Скачать руководство пользователя страница 6](http://html.mh-extra.com/html/haspo/114/114_assembly-instruction-manual_2106164006.webp)
6
2. Assembly of the net:
a) At first put up the goal and then stick ring nuts M 6 x 60 for fixing of tension
cord through the boreholes of the net hoops and fix them with self locking
cap nuts DIN 986, M 6 (see photo).
Take care that rings point to the goal inside.
b) Then fix net holders at the net rope. Bend open net holders a little and
press rope into the holders. We recommend the following distribution of net
holders for the different goal sizes:
Size
Net holders
Total crossbar upright ground bar ground tube
Cat.no.
7.32 x 2.44m
74
20
10
7
20
114
5.00 x 2.00m
58
16
8
5
16
115
3.00 x 2.00m
50
12
8
5
12
1159
c) After having mounted all net holders fix net at the goal construction. Stick
netholders in the net hook rail and
fix them with a 90 degrees’ rotation.
If necessary use a thin screw driver.
Do not pull the net over the net hoops from the outside. Take care that it is
freely suspended between the hoops.
When mounting the net at the ground tube fit net holders into the groove.
d) Now the tensioning cord can be tightened between the ring nuts (see point
a) which are provided at the net hoops.
e) Dismantling of the net is also done by rotation of the net holders through 90
degrees. If necessary use a thin screw driver.