BAS-029, BAS-030 & BAS-031
Heavy Duty Basketball
Code:
Product:
IMPORTANT
PLEASE READ THE ASSEMBLY INSTRUCTIONS
CAREFULLY BEFORE STARTING TO ASSEMBLE YOUR GOAL. THIS
GOAL MUST BE ASSEMBLED BY 4 COMPETENT ADULTS.
Assembly Instructions
1
2
Dig a hole 915mm deep and 915 x 915mm square and use a cube of concrete to secure post. If socket is used, the same
measurements of concrete will be required.
Mark a line on the upright which is 914mm from the base. Insert the upright into the hole making sure that this mark is
inline with ground level. Then fill the hole with concrete. Support the upright as shown in the assembly instructions.
Use spirit level to ensure that the upright is vertical. If socketed type goals, concrete the socket in so that the top of
socket is at ground level. Also use a spirit level to ensure the socket is vertical.
When the concrete has set, assemble the ring to the backboard, then fit the backboard to the board supports and secure
to the upright using nuts and bolts provided. (See pack contents)
3
5
12
6
10
9
11
8
Ground Level
Ground Level
SUPPOR
T
WHILE
CONCRETE
SETS
SUPPOR
T
WHILE
C
ONCRETE
SETS
SUPPOR
T
WHILE
CONCRETE
SETS
SUPPOR
T
WHILE
CONCRETE
SETS
SUPPOR
T
WHILE
CONCRE
TE
SETS
SUPPOR
T
WHILE
CONCRETE
SETS
Ground Level
Ground Level