Assembly Instructions

1
2

Dig a hole 915mm deep and 915 x 915mm square and use a cube of concrete to secure post. If socket is used, the same

measurements of concrete will be required.

Mark a line on the upright which is 914mm from the base. Insert the upright into the hole making sure that this mark is

inline with ground level. Then fill the hole with concrete. Support the upright as shown in the assembly instructions.
Use spirit level to ensure that the upright is vertical. If socketed type goals, concrete the socket in so that the top of

socket is at ground level. Also use a spirit level to ensure the socket is vertical.

When the concrete has set, assemble the ring to the backboard, then fit the backboard to the board supports and secure

to the upright using nuts and bolts provided. (See pack contents)

3

5

12

6

10

9

11

8

Ground Level

Ground Level

SUPPOR

T

WHILE

CONCRETE

SETS

SUPPOR

T

WHILE

C

ONCRETE

SETS

SUPPOR

T

WHILE

CONCRETE

SETS

SUPPOR

T

WHILE

CONCRETE

SETS

SUPPOR

T

WHILE

CONCRE

TE

SETS

SUPPOR

T

WHILE

CONCRETE

SETS

Ground Level

Ground Level

Отзывы: