background image

65 

 

9.3  Hook and Chain Parts 

 

Figure 

No. 

Part Name 

Parts 

Per 

Hoist 

015S 020S 020L 

Top Hook Assembly 

ER2ES1001 

 

2 Hook 

Latch 

ER2ES1002 

Suspender E (For Manual Trolley) 

T7GB004020 

Connection Yoke PG* 
(For Manual Trolley) 

1 ER2ES5027* 

6 Yoke 

Bolt 

ER1ES9032 

7 Slotted 

Nut 

ES088020L 

8 Split 

Pin 

9009436 

9 Suspender 

ER2ES9031 

10 Top 

Pin 

ER2ES9121 

11 Plate 

ER2ES9123 

12 

Socket Bolt With Spring Washer 

J1BG10601212 

13 Shaft 

Clip 

ER2ES9186 

14 

Chain Guide A 

ER2ES9331 

15 Chain 

Guide 

ER2ES9332 

16 Socket 

Bolt 

9091274 

17 Spring 

Lock 

Washer 

9012711 

18 

Machine Screw With Spring Washer 

E6F151003 

19 Guide 

Roller 

ER1DL9333 

20 Roller 

Pin 

ER1DL9334 

21 Limit 

Lever 

ER2ES9337 

22 Limit 

Lever 

Pin 

1  ER2EL9338 ER2ES9338 ER2EL9338 

23 Limit 

Lever 

Spring 

ER2CS9357 

24 Limiting 

Plate 

 ER1ES9054 

25 Chain 

Spring 

 E7SS020S9047 

ER1DL9051 

26 Cushion 

Rubber 

1  ER1ES9053 

 

27 Cushion 

Rubber 

ER1ES9053 

28 Stopper 

Assembly 

ER1ES1041 

29 

Bottom Hook Complete Assembly 

ER2EM1011 

ER2ES1011 

 

30 Hook 

Latch 

1  ER2EM1002 

ER2ES1002 

31 

Plastic Chain Container Assembly 
(Max. Lifting Height 13ft) 

1 PBK2-E 

 

32 Plastic 

Chain 

Container 

ER2ES1401 

 

33 Plastic 

Container 

Spring 

Assembly 

ER2ES1416 

34 

Canvas Chain Container Assembly 
(Max. Lifting Height 60ft) 

1 BK2E2 

 

35 Canvas 

Chain 

Container 

ER2ES5405 

 

36 Socket 

Bolt 

90912107 

 

37 Lever 

Nut 

ES066075 

 

38 Socket 

Bolt 

90912104 

39 NP 

Load 

Chain 

 

LCER2020NP 

40 

End Suspender Kit 

ENDS2E 

 

41 End 

Suspender 

ER2ES9408 

 

42 Socket 

Bolt 

90912107 

 

43 Lever 

Nut 

ES066075 

 

44 Socket 

Bolt 

90912152 

 

45 Lever 

Nut 

ES857005S 

*Connection Yoke PG replaces Connection Yoke P (ER2ES9027) and Connection Yoke G (ER2ES9029) 

 

Содержание ER2 Series

Страница 1: ...Code Lot and Serial Number This equipment should not be installed operated or maintained by any person who has not read and understood all the contents of this manual Failure to read and comply with...

Страница 2: ...nting Location 3 4 Mounting the Hoist 3 5 Electrical Connections 3 6 VFD Setup Dual Speed Only 3 7 Preoperational Checks and Trial Operation 4 0 25 4 1 Introduction 4 2 4 3 Hoist Controls 5 0 29 5 1 G...

Страница 3: ...Lubrication Load Chain Hooks and Suspension 6 3 Lubrication Gearbox 6 4 Motor Brake 6 5 Load Chain 6 6 Friction Clutch and Mechanical Load Brake with Friction Clutch 6 7 Storage 6 8 Outdoor Installat...

Страница 4: ...damage Notice is used to notify people of installation operation or maintenance information which is important but not directly hazard related These general instructions deal with the normal installa...

Страница 5: ...quired for the crane and monorail to comply with applicable crane design and safety standards The crane designer crane manufacturer or user is responsible to furnish these additional items Run Running...

Страница 6: ...nstall inspect test maintain and operate a hoist in accordance with National Electric Code If the hoist is installed as part of a total lifting system such as an overhead crane or monorail it is also...

Страница 7: ...The warning tag illustrated below in Figure 1 1 is supplied with each hoist shipped from the factory If the tag is warnings attached to this hoist Tag is not shown actual size front back Figure 1 1 W...

Страница 8: ...ct Code 2 1 2 ER2 and NER2 Models Harrington ER2 series hoists are available in two versions the ER2 and NER2 These two versions differ with the presence of a mechanical load brake as standard equipme...

Страница 9: ...y Voltage Single Speed Standard Reconnectable 208 230 460V 3 60 Single Speed Optional 575V 3 60 or Special Voltages Frequencies Available Dual Speed Standard 208 230V 3 60 or 460V 3 60 Dual Speed Opti...

Страница 10: ...ER2020S 28 4 7 16 4 7 9 10 2 x 1 5 201 198 1 6 2 1 2 N ER2025S 22 4 7 16 4 7 9 11 2 x 1 5 227 225 1 9 3 N ER2030C 17 4 7 16 4 7 9 10 2 x2 5 234 234 3 2 5 N ER2050L 11 4 7 16 4 7 9 11 2 x 2 5 289 284 3...

Страница 11: ...B 1 1 0 7 0 9 0 7 1 4 1 1 001HCC 003SCC T 1 1 0 7 0 9 0 7 1 4 1 1 B 0 8 0 5 0 7 0 5 1 4 1 1 010L 010S T B 1 5 0 9 1 2 0 9 1 7 1 2 020C T B 1 9 1 1 1 6 1 1 2 0 1 5 015S T 2 0 1 3 1 7 1 3 2 1 1 5 B 1 7...

Страница 12: ...1 6 6 9 5 6 5 6 N ER2030C 32 9 9 2 27 6 30 8 16 8 16 8 13 6 16 8 14 0 14 0 1 8 8 5 3 2 3 2 N ER2050L 33 5 9 2 28 9 32 5 17 5 17 5 13 2 16 8 15 7 15 7 1 9 9 1 3 3 3 3 DUAL SPEED N ER2001HD 13 8 8 2 21...

Страница 13: ...al load brake equipped hoists are shipped with a separate air vented oil cap This vented oil cap must be installed prior to use To install remove an existing oil plug and replace with the vented oil c...

Страница 14: ...oad end of the chain to Chain Guide A with the End Suspender provided For 5 ton hoist connect the no load end of the chain directly to Chain Guide A if Chain Guide A is notched to accept the chain Mak...

Страница 15: ...body and the chain stopper is installed on the third link from the free end To place the chain into the chain container feed the free end of the chain into the container Take care to avoid twisting o...

Страница 16: ...6 Correct all chain irregularities before conducting the first hoist operation Figure 3 5 Twist in Load Chain 2 3 and 5 Ton Double Fall Models Figure 3 6 Capsized Hook and Chain Double Fall Models 3 3...

Страница 17: ...ped with a VFD The VFD is used to control the high and low lifting speeds The speeds come preset from the factory See Table 3 6 Speed frequency can be customized Refer to Section 3 6 10 for hoist spec...

Страница 18: ...e Connections 3 5 8 Connection to Electrical Power Source The red blue and black wires of the Power Supply Cable should be connected to an Electric Power Disconnect Switch or Circuit Breaker This conn...

Страница 19: ...ation 3 6 3 All dual speed hoists are equiped with a VFD The VFD is used to control the high and low lifting speeds The speeds come preset from the factory Table 3 6 Speed frequency can be customized...

Страница 20: ...in the display Table 3 3 shows the corresponding digital characters to its English eqivalent Table 3 3 Digital Character Key Character Digital Display Character Digital Display Character Digital Displ...

Страница 21: ...0 8 0 7 2 55 0 54 0 N ER2010LD Low 1 1 14 2 6 2 5 53 5 54 0 2 8 2 5 55 0 54 0 Std 2 5 14 7 3 7 3 53 5 54 0 8 0 7 2 55 0 54 0 N ER2010SD Low 2 2 28 2 3 2 1 53 0 53 5 2 7 3 0 53 0 53 5 Std 4 5 28 7 3 7...

Страница 22: ...to display the parameter setting screen blinking 4 Press or until the desired parameter is displayed blinking Low Speed d1 01 High Speed d1 02 5 When you press the current setting value is displayed d...

Страница 23: ...e values that may be changed Title Parameter Description Min Frequency Hz Low Speed d1 01 Default setting dependant upon hoist Refer to Table 3 7 Max frequency Hz High Speed d1 02 Default setting depe...

Страница 24: ...ed and securely installed on the beam 3 7 7 Ensure that all nuts bolts and split pins cotter pins are sufficiently fastened 3 7 8 Pull down on the Pendant and ensure that the Cord Strain Relief Cable...

Страница 25: ...E ADJUSTMENT OR REPAIR AND TO BE INSTRUCTED TO STOP OPERATION IF SUCH MALFUNCTIONS OCCUR AND TO IMMEDIATELY ADVISE THEIR SUPERVISOR SO CORRECTIVE ACTION CAN BE TAKEN HOIST OPERATORS SHOULD HAVE NORMAL...

Страница 26: ...ontaminants NOT operate hoist when it is restricted from forming a straight line from hook to support in the direction of loading NOT use load chain as a sling or wrap load chain around load NOT apply...

Страница 27: ...Make sure the load is free to move and will clear all obstructions Avoid swinging the load or hook Make sure hook travel is in the same direction as shown on controls Inspect the hoist regularly repl...

Страница 28: ...rol depress the UP button to raise the hoist load chain hook or the DOWN button to lower the hoist load chain hook as shown in Figure 4 1 To stop motion release the buttons 4 3 4 Dual Speed Pendant Co...

Страница 29: ...modified hoists shall be inspected by a designated person to ensure compliance with the applicable provisions of this manual 5 2 2 Inspection Classification the inspection procedure for hoists in reg...

Страница 30: ...on such that the hoist is maintained in safe working condition 5 4 2 For inspections where load suspension parts of the hoist are disassembled a load test per ANSI ASME B30 16 must be performed on the...

Страница 31: ...so indicate Such disassembly and further inspection should only be performed by a qualified person trained in the disassembly and re assembly of the hoist Table 5 3 Hoist Inspection Methods and Crite...

Страница 32: ...e or replace as required Hooks Hook Latches Visual Function Latch should not be deformed Attachment of latch to hook should not be loose Latch spring should not be missing and should not be weak Latch...

Страница 33: ...sually or via detection of unusual sounds or vibration during operation Replace Bolts Nuts and Rivets Visual Check with Proper Tool Bolts nuts and rivets should not be loose Tighten or replace as requ...

Страница 34: ...cuits for opposing motions e g up and down Repair or replace as necessary Pendant Cord Visual Electrical Continuity Surface of cord should be free from nicks gouges and abrasions Each conductor in cor...

Страница 35: ...99 25 2 020C 2 46 62 5 1 57 40 0 1 42 36 0 1 14 29 0 1 02 26 0 020L 020M 020S 025S 2 72 69 0 1 71 43 5 1 63 41 3 1 24 31 5 1 18 29 9 030L 030C 2 87 73 0 1 87 47 5 1 78 45 1 1 36 34 5 1 29 32 8 050L 3...

Страница 36: ...1 84 0 3 41 86 5 0 24 6 0 0 21 5 4 010L 010S 020C 4 25 108 0 4 38 111 2 0 30 7 7 0 27 6 9 015S 020L 020S 030C 5 63 143 0 5 80 147 2 0 40 10 2 0 36 9 2 025S 030L 050L 6 18 157 0 6 37 161 7 0 44 11 2 0...

Страница 37: ...on inch mm Discard Single 001H to 020L 0 030 0 75 020S to 050L 0 043 1 10 Dual 001HD 003SD 005LD 0 024 0 60 003HD 005SD to 020LD 0 016 0 40 020SD to 050LD 0 020 0 50 Figure 5 4 Hub Joint Note Hub Join...

Страница 38: ...L 005S 0 12 3 0 0 08 2 0 010L 010S 020C 0 18 4 5 0 12 3 0 015S 020L 020S 030C 0 26 6 5 0 17 4 3 025S 030L 050L 0 29 7 3 0 19 4 9 Table 5 9 Chain Spring Length Dimensions Capacity Code inch mm Standard...

Страница 39: ...the display will automatically 1 The example in Figure 6 1 is as follows I Operating Hours 1 089 hours Number of Starts 2 031 091 starts Figure 6 1 Count Hour Meter 6 1 2 Contactor The C H Meter can b...

Страница 40: ...ion under 1 000 starts 1 to 999 the value of U7 01 is incremented by 1 and the value of U7 02 is reset to 0 U7 03 Hours of Operation The number of hours of operation in both the up and down directions...

Страница 41: ...le Brake 6 1 6 Hook and Yoke The C H Meter can be used to determine when the Top Bottom Hook and Yoke should be replaced Refer to Table 6 6 Table 6 6 Criteria for Top Bottom Hook and Yoke Replacement...

Страница 42: ...nd Suspension Components Hooks Bearings should be cleaned and lubricated at least once per year for normal usage Clean and lubricate more frequently for heavier usage or severe conditions Suspension P...

Страница 43: ...03S 2 95 75 003H 005L 005S 3 94 100 010L 010S 020C 3 94 100 015S 020L 020S 030C 4 72 120 025S 030L 050L 5 12 130 6 3 5 REPLACING OIL Change gear oil at least once every 5 years The oil should be chang...

Страница 44: ...CALTEX ER2 Gear Oil Harrington standard Farm Gear B NIPPON OIL Harrington Part Numbers 7019801 1 Quart 7019802 2 Gallons 6 4 Motor Brake 6 4 1 The motor brake on the NER2 ER2 hoist is not adjustable 6...

Страница 45: ...Section 3 2 for the proper locations 8 Double falls 020C 030C 050L Feed the end link on the load side of the new chain through the required chain components step 4 above and the bot chain components t...

Страница 46: ...the weather at all times 6 8 2 Possibility of corrosion on components of the hoist increases for installations where salt air and high humidity are present The hoist may require more frequent lubrica...

Страница 47: ...ubleshooting Guide Symptom Cause Remedy Hoist moving in wrong direction Power supply reversed phased Switch 2 of the 3 power supply cord wires at the power source Refer to Section 3 7 11 for instructi...

Страница 48: ...coils for open or short circuit Check all connections on motor circuit Check for burned contacts Replace as needed Faulty VFD dual speed only Check fault codes Reference Section 3 6 Reset VFD by pres...

Страница 49: ...Motor or brake overheating Excessive load Reduce load to within rated capacity of hoist Excessive duty cycle Reduce frequency of lifts Wrong voltage or frequency Check voltage and frequency of power s...

Страница 50: ...c place of business to customer Customer must obtain a Return Goods Authorization as directed by Harrington or Harringto published repair center prior to shipping product for warranty evaluation An ex...

Страница 51: ...ovided on the cover of this manual ER2 NER2 Series Nameplate The parts list is arranged into the following sections Section Page 9 52 9 56 9 3 Hook and Chain 60 9 4 Electric Parts Single Speed 78 9 84...

Страница 52: ...ake Cover F 1 ER2BS9115 ER2CL9115 ER2CS9115 ER2CL9115 ER2DS9115 ER2CS9115 M ER2CL9149 ER2CL9149 ER2DL9149 5 Packing B 1 ER2BS9119 ER2CS9119 ER2CL9119 ER2DS9119 ER2CS9119 6 Set Pin S 2 ES120003 7 Socke...

Страница 53: ...I6103 M ER2BS6102 ER2CS6102 ER2DS6102 26 Oil Plug 1 E3S111003 27 Plug Packing 1 E3S112003 28 Spring Pin 1 9148128 E3S129005S 29 Packing G F 1 ER2BS9116 ER2CS9116 ER2DS9116 M 2 30 Set Pin S F 2 ES12000...

Страница 54: ...25S 050L 1 Fan Cover 1 ER2DS9107 ER2ES9107 2 Fan 1 ER2DS9108 ER2ES9108 3 Snap Ring 1 9047116 9047122 4 Brake Cover F 1 ER2DS9115 ER2ES9115 M ER2EL9149 5 Packing B 1 ER2DS9119 ER2ES9119 6 Set Pin S 2 E...

Страница 55: ...6102 26 Oil Plug 1 E3S111003 27 Plug Packing 1 E3S112003 28 Spring Pin 1 E3S129005S 29 Packing G F 1 ER2ES9116 ER2FS9116 M 2 30 Set Pin S F 2 ES120010S M 4 31 Socket Bolt F 4 5 9091280 9091286 9091280...

Страница 56: ...56 9 2 Gearing Parts Figure 9 2 1 Gearing Parts...

Страница 57: ...e Complete Assembly M 1 ER2BH1274 ER2BS1274 ER2CH1274 ER2CS1274 ER2CL1274 ER2DS1274 ER2DL1274 15 Wave Washer F 1 E1DBX20S9311 16 Nut Cover F 1 ER1CS9235 17 Name Plate FP Adjustment Of Friction Clutch...

Страница 58: ...58 9 2 Gearing Parts Figure 9 2 2 Gearing Parts...

Страница 59: ...r F 1 ER1DS9234 ER2ES9234 16 Nut Cover F 1 ER1DS9235 ER2ES9235 17 Name Plate FP Adjustment Of Friction Clutch Prohibited F 1 ER1BS9892 18 Gear B Assembly F 1 ER2EM5262 ER2EL5262 ER2FS5262 M ER2EM5306...

Страница 60: ...60 9 3 Hook and Chain Parts Figure 9 3 1 Hook and Chain Parts...

Страница 61: ...on Rubber 2 ER2BS9053 ER1CS9053 23 Stopper Assembly 1 ES1045003 ER2CS1041 24 Bottom Hook Complete Assembly 1 ER2BH1011 ER2BS1011 ER2CH1011 ER2CS1011 25 Hook Latch 1 ER2CS1002 26 Plastic Chain Containe...

Страница 62: ...62 9 3 Hook and Chain Parts Figure 9 3 2 Hook and Chain Parts...

Страница 63: ...F554010 19 Guide Roller 1 ER2DS9333 20 Roller Pin 1 ER1CS9334 21 Limit Lever 1 ER2DS9337 22 Limit Lever Pin 1 ER2DS9338 23 Limit Lever Spring 1 ER2CS9357 24 Cushion Rubber 2 ER1DS9053 25 Stopper Assem...

Страница 64: ...64 9 3 Hook and Chain Parts Figure 9 3 3 Hook and Chain Parts...

Страница 65: ...8 ER2ES9338 ER2EL9338 23 Limit Lever Spring 1 ER2CS9357 24 Limiting Plate 1 ER1ES9054 25 Chain Spring 1 E7SS020S9047 ER1DL9051 26 Cushion Rubber 1 ER1ES9053 27 Cushion Rubber 1 ER1ES9053 28 Stopper As...

Страница 66: ...66 9 3 Hook and Chain Parts Figure 9 3 4 Hook and Chain Parts...

Страница 67: ...ing Washer 4 E6F151003 21 Guide Roller 1 ER1DS9333 22 Roller Pin 1 ER1DL9334 23 Limit Lever 1 ER2DS9337 24 Limit Lever Pin 1 ER2DS9338 25 Limit Lever Spring 1 ER2CS9357 26 Cushion Rubber 2 ER1DS9053 2...

Страница 68: ...68 9 3 Hook and Chain Parts Figure 9 3 5 Hook and Chain Parts...

Страница 69: ...Guide Roller 1 ER1DL9333 22 Roller Pin 1 ER1DL9334 23 Limit Lever 1 ER2ES9337 24 Limit Lever Pin 1 ER2ES9338 25 Limit Lever Spring 1 ER2CS9357 26 Cushion Rubber 1 ER1EM9053 27 Limiting Plate 1 ER1ES90...

Страница 70: ...70 9 3 Hook and Chain Parts Figure 9 3 6 Hook and Chain Parts...

Страница 71: ...d Trolley 1 ER2FS9031 10 Connection Shaft Assembly 1 ER2FS6121 11 Shaft Plug 1 ER2FS9128 12 O Ring 2 9013317 13 Fixing Shaft Assembly 1 ER2FS6122 14 Fixing Shaft Plug 1 ER2FS9131 15 O Ring 2 9013307 1...

Страница 72: ...72 9 3 Hook and Chain Parts Figure 9 3 7 Hook and Chain Parts...

Страница 73: ...S9338 10 Limit Lever Spring 1 ER2CS9357 11 Limiting Plate 1 ER1FH9054 12 Chain Spring 1 ER1EM9051 13 Cushion Rubber 1 ER1EM9053 14 Stopper Assembly 1 ER1ES1041 15 Canvas Chain Container Assembly Max L...

Страница 74: ...74 9 3 Hook and Chain Parts Figure 9 3 8 Hook and Chain Parts...

Страница 75: ...13 Top Pin Plug Assembly 1 ER2FS6128 14 O Ring 2 9013317 15 Fixing Shaft Assembly 1 ER2FS6122 16 Fixing Shaft Plug Assembly 1 ER2FS6131 17 O Ring 2 9013307 18 Plate A 1 ER1ES9123 19 Socket Bolt With...

Страница 76: ...76 9 3 Hook and Chain Parts Figure 9 3 9 Hook and Chain Parts...

Страница 77: ...er 1 ER2FS9337 9 Limit Lever Pin 1 ER2FS9338 10 Limit Lever Spring 1 ER2CS9357 11 Cushion Rubber 1 ER1EM9053 12 Stopper Assembly 2 ER1ES1041 13 Limiting Plate 1 ER1FH9054 14 Chain Spring 2 ER1EM9051 1...

Страница 78: ...78 9 4 Electric Parts Single Speed Figure 9 4 1 Electric Parts Single Speed...

Страница 79: ...ECP91CHAF ECP91CHAE 13 CH Meter Support 1 ECP99BKBA 14 Rectifier 1 ECP93DIAA 15 Fuse 1 9006275 16 Fuse Holder 1 ECP92FZAA 17 Name Plate CH 1 ECP99CHAA 18 Terminal Block 6P 1 ECP1306AD 19 Fulcrum Pin 1...

Страница 80: ...80 9 4 Electric Parts Single Speed Figure 9 4 2 Electric Parts Single Speed...

Страница 81: ...er Support 1 ECP99BKBA 14 Rectifier 1 ECP93DIAA ECP94DIAA 15 Fuse 1 9006275 16 Fuse Holder 1 ECP92FZAA 17 Name Plate CH 1 ECP99CHAA 18 Terminal Block 6P 1 ECP1306AD ECP1306AD ECP1306AF 21 Machine Scre...

Страница 82: ...82 9 4 Electric Parts Single Speed Figure 9 4 3 Electric Parts Single Speed...

Страница 83: ...Support 1 ECP99BKBA 14 Rectifier 1 ECP94DIAA 15 Fuse 1 9006275 16 Fuse Holder 1 ECP92FZAA 17 Name Plate CH 1 ECP99CHAA 18 Terminal Block 6P 1 ECP1306AF 21 Machine Screw 2 9798512 22 Fulcrum Pin 1 ER2...

Страница 84: ...84 9 5 Electric Parts Dual Speed Figure 9 5 1 Electric Parts Dual Speed...

Страница 85: ...ECP91KB02 10A Fuse 1 9006275 11 Board Support 1 ECP99BKAA 12 Transformer 2V 1 TRF32C612 4V TRF32N612 13 Rectifier 1 ECP93DIAA 14 Terminal Block 6P 1 ECP1306AD 15 Fulcrum Pin 1 ER2CS9449 16 Cover Suspe...

Страница 86: ...86 9 5 Electric Parts Dual Speed Figure 9 5 2 Electric Parts Dual Speed...

Страница 87: ...21 INV615M21 INV622M21 10 Interface Board 1 ECP91KB02 10A Fuse 1 9006275 11 Board Support 1 ECP99BKAA 12 Transformer 2V 1 TRF32C612 4V TRF32N612 13 Rectifier 1 ECP93DIAA 14 Terminal Block 6P 1 ECP1306...

Страница 88: ...88 9 5 Electric Parts Dual Speed Figure 9 5 3 Electric Parts Dual Speed...

Страница 89: ...99BKAA 12 Transformer 2V 1 TRF32C612 4V TRF32N612 13 Rectifier 1 ECP94DIAA ECP94DIAA 14 Terminal Block 6P 1 ECP1306AF ECP1306AF 17 Machine Screw 2 9798512 18 Fulcrum Pin 1 ER2CS9449 19 Cover Suspender...

Страница 90: ...90 9 6 Power Supply and Pendant Parts Figure 9 6 1 Power Supply and Pendant Parts Plug Connection...

Страница 91: ...crew W Spring Washer 6 MS561010 10 Socket Frame Packing 1 ER2CS9512 11 Power Supply Cable 4C Assembly 1 ZBZA12CH1000 ZBZA12AH1000 12 Power Supply Cable 4C ft 16 4 14 4 13 Plug 4P 1 ECP2304AD ECP2304AF...

Страница 92: ...92 9 6 Power Supply and Pendant Parts Figure 9 6 2 Power Supply and Pendant Parts Direct Connection...

Страница 93: ...Power Supply Cable 4C Assembly 1 ZBZA12CH1000 ZBZA12AH1000 12 Power Supply Cable 4C ft 16 4 14 4 13 Cable Support Arm 1 ER1BS9541 14 Cable Sup 12 Assembly 1 ES822003 Cable Sup 14 Assembly MS1724010 15...

Страница 94: ...94 This Page Intentionally Left Blank...

Страница 95: ...95 This Page Intentionally Left Blank...

Страница 96: ...Harrington Hoists Inc 401 West End Avenue Manheim PA 17545 Toll Free 800 233 3010 Phone 717 665 2000 Fax 717 665 2861 ER2OM ENG...

Отзывы: